Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
278
matching recommendationsSIC | 3324 | Steel Investment Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0315 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $1,133 | $1,850 | n/a |
IC0315 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $82,148 | $379,057 | n/a |
IC0315 # 11 Y:2024 | 11 | 2024 | USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING | $12,134 | $7,693 | n/a |
IC0315 # 10 Y:2024 | 10 | 2024 | USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING | $369,968 | $14,366 | n/a |
IC0315 # 09 Y:2024 | 09 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,224 | $0 | n/a |
IC0315 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $525 | $242 | n/a |
IC0315 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,478 | $227 | n/a |
IC0315 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $6,223 | $2,225 | n/a |
IC0315 # 07 Y:2024 | 07 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,991 | $7,497 | n/a |
IC0315 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,069 | $442 | n/a |
IC0315 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,959 | $820 | n/a |
CW0127 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,576 | $56,000 | n/a |
CW0127 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,943 | $21,648 | n/a |
CW0127 # 05 Y:2023 | 05 | 2023 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $10,872 | $33,000 | n/a |
CW0127 # 06 Y:2023 | 06 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $9,906 | $19,900 | n/a |
CW0127 # 02 Y:2023 | 02 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $16,199 | $33,933 | n/a |
CW0127 # 03 Y:2023 | 03 | 2023 | RECYCLE CASTING SAND | $414,227 | $38,394 | n/a |
WM0180 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,388 | $0 | Not Implemented |
WM0180 # 07 Y:2022 | 07 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,006 | $0 | Implemented |
WM0180 # 08 Y:2022 | 08 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,804 | $0 | Implemented |
WM0180 # 05 Y:2022 | 05 | 2022 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,714 | $0 | Not Implemented |
WM0180 # 04 Y:2022 | 04 | 2022 | USE SYNTHETIC LUBRICANT | $2,843 | $4,510 | Implemented |
WM0180 # 12 Y:2022 | 12 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $555 | $1,060 | Not Implemented |
WM0180 # 03 Y:2022 | 03 | 2022 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,931 | $8,560 | Implemented |
WM0180 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,957 | $3,100 | Implemented |