IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

596

matching recommendations
Reset
SIC 3325 Steel Foundries, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0253 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,250 $1,000 Implemented
AM0253 # 04 Y:1995 04 1995 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,860 $5,720 Implemented
AM0253 # 05 Y:1995 05 1995 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,170 $0 Implemented
AM0253 # 06 Y:1995 06 1995 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $727 $95 Implemented
OR0244 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,764 $14,938 Implemented
OR0244 # 02 Y:1995 02 1995 UPGRADE CONTROLS ON COMPRESSORS $1,725 $200 Implemented
OR0244 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $700 $1,195 Implemented
OR0244 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $14,400 $5,385 Not Implemented
KG0033 # 01 Y:1995 01 1995 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $26,990 $5,000 Not Implemented
KG0033 # 02 Y:1995 02 1995 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $10,625 $2,500 Not Implemented
KG0033 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,597 $17,060 Not Implemented
KG0033 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,788 $767 Not Implemented
KG0033 # 05 Y:1995 05 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,330 $2,480 Not Implemented
KG0033 # 06 Y:1995 06 1995 USE SYNTHETIC LUBRICANT $325 $0 Not Implemented
IA0117 # 01 Y:1995 01 1995 REDUCE VENTILATION AIR $56,609 $143,578 Not Implemented
IA0117 # 02 Y:1995 02 1995 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $15,769 $1,500 Not Implemented
IA0117 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,328 $212 Implemented
IA0117 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,102 $75 Not Implemented
IA0117 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,256 $2,781 Implemented
IA0117 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,532 $3,975 Implemented
OD0035 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,188 $9,793 Implemented
OD0035 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,524 $9,150 Implemented
OD0035 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $461 $265 Not Implemented
OD0035 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $482 $1,389 Not Implemented
AM0221 # 01 Y:1994 01 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $58,720 $80,000 Not Implemented