Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 1997 |
Principal Product | Sand castings |
NAICS | n/a |
SIC | 3325 - Steel Foundries, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 220 Tons |
Production Hrs. Annual | 4,160 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $275,984 | 11,016,120 | kWh | $0.03 |
Electricity Demand | $220,167 | - | kW-months/year | - |
Electricity Fees | $1,730 | - | $ | - |
Natural Gas | $190,960 | 71,593 | MMBtu | $2.67 |
TOTAL ENERGY COSTS | $807,871 | |||
RECOMMENDED SAVINGS* | $340,265 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,653 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.5221 RECYCLE CASTING SAND |
Savings: $290,422 Cost: $282,500 |
$(-4,010) | (-74,736) | $(-14,332) | (-7,488) | $308,764 | 12,480,000 | - | - |
$(-4,010) (-74,736) kWh |
$(-14,332) (-7,488) MMBtu |
$308,764 12,480,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $9,080 Cost: $1,260 |
- | - | $9,080 | 4,744 | - | - | - | - |
- - kWh |
$9,080 4,744 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION |
Savings: $5,369 Cost: $6,768 |
- | - | $5,369 | 2,805 | - | - | - | - |
- - kWh |
$5,369 2,805 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $3,150 Cost: $630 |
$3,150 | 109,906 | - | - | - | - | - | - |
$3,150 109,906 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $2,850 Cost: $4,477 |
$(-92) | (-3,224) | $2,942 | 1,537 | - | - | - | - |
$(-92) (-3,224) kWh |
$2,942 1,537 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $1,033 Cost: $2,805 |
- | - | $1,033 | 540 | - | - | - | - |
- - kWh |
$1,033 540 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $147 Cost: $278 |
$65 | 1,758 | - | - | - | - | $82 | - |
$65 1,758 kWh |
- - MMBtu |
- - lb |
$82 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $134 Cost: $116 |
$134 | 4,689 | - | - | - | - | - | - |
$134 4,689 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $28,080 Cost: $2,090 |
- | - | - | - | - | - | $28,080 | - |
- - kWh |
- - MMBtu |
- - lb |
$28,080 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $340,265 Cost: $300,924 |
$(-753) | 38,393 | $4,092 | 2,138 | $308,764 | 12,480,000 | $28,162 | - | $(-753) 38,393 kWh |
$4,092 2,138 MMBtu |
$308,764 12,480,000 lb |
$28,162 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,653 Cost: $7,514 |
$3,284 | 114,595 | $5,369 | 2,805 | - | - | - | - | $3,284 114,595 kWh |
$5,369 2,805 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes |