IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

589

matching recommendations
Reset
SIC 3325 Steel Foundries, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0226 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,163 $30,000 Not Implemented
TT0226 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,740 $2,000 Implemented
TT0226 # 07 Y:2019 07 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,194 $4,515 Not Implemented
TT0226 # 02 Y:2019 02 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $111,520 $54,000 Not Implemented
NL0019 # 04 Y:2018 04 2018 ELIMINATE/REDUCE AN OPERATION $5,000 $6,500 Not Implemented
NL0019 # 02 Y:2018 02 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $9,412 $32,000 Not Implemented
NL0019 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,000 $23,000 Implemented
NL0019 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,580 $0 Implemented
UU0120 # 04 Y:2017 04 2017 UPGRADE CONTROLS ON COMPRESSORS $12,184 $800 Implemented
UU0120 # 01 Y:2017 01 2017 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS $113,750 $5,600 Not Implemented
UU0120 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $32,948 $23,006 Not Implemented
UU0120 # 05 Y:2017 05 2017 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $6,334 $400 Implemented
UU0120 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,227 $410 Implemented
UU0120 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,587 $61,481 Implemented
UU0120 # 07 Y:2017 07 2017 INSTALL COMMON HEADER ON COMPRESSORS $4,024 $5,000 Implemented
UU0120 # 09 Y:2017 09 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,929 $0 Implemented
UU0120 # 08 Y:2017 08 2017 OPTIMIZE PLANT POWER FACTOR $3,894 $3,500 Not Implemented
UD0968 # 15 Y:2017 15 2017 USE OPTIMUM THICKNESS INSULATION $162 $344 Not Implemented
UD0968 # 14 Y:2017 14 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $687 $1,810 Not Implemented
UD0968 # 17 Y:2017 17 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $27,353 $42,400 Implemented
UD0968 # 02 Y:2017 02 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,800 $0 Not Implemented
UD0968 # 01 Y:2017 01 2017 REDUCE EXCESSIVE BOILER BLOWDOWN $8,230 $0 Not Implemented
UD0968 # 04 Y:2017 04 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,217 $118 Implemented
UD0968 # 12 Y:2017 12 2017 INSULATE BARE EQUIPMENT $31,081 $33,760 Not Implemented
UD0968 # 16 Y:2017 16 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,850 $38,175 Implemented