Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsSIC | 3325 | Steel Foundries, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0330 # 08 Y:2007 | 08 | 2007 | COVER OPEN TANKS | $733 | $1,000 | Not Implemented |
UM0330 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $954 | $1,500 | Not Implemented |
UM0330 # 06 Y:2007 | 06 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,228 | $4,500 | Not Implemented |
UM0330 # 05 Y:2007 | 05 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,605 | $500 | Not Implemented |
UM0330 # 04 Y:2007 | 04 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,732 | $1,300 | Not Implemented |
UM0330 # 03 Y:2007 | 03 | 2007 | REDUCE VENTILATION AIR | $1,775 | $516 | Not Implemented |
UM0330 # 02 Y:2007 | 02 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,366 | $5,250 | Not Implemented |
UM0330 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,750 | $12,000 | Not Implemented |
UM0277 # 01 Y:2005 | 01 | 2005 | REDUCE SCRAP PRODUCTION | $34,320 | $7,500 | Implemented |
UM0277 # 04 Y:2005 | 04 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,247 | $1,000 | Implemented |
UM0277 # 03 Y:2005 | 03 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,729 | $3,000 | Not Implemented |
UM0277 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,442 | $1,000 | Implemented |
UM0178 # 04 Y:2001 | 04 | 2001 | ELIMINATE COMBUSTIBLE GAS IN FLUE GAS | $19,408 | $9,100 | n/a |
UM0178 # 03 Y:2001 | 03 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $42,749 | $73,500 | n/a |
UM0178 # 02 Y:2001 | 02 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $400 | $1,000 | Not Implemented |
UM0178 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,563 | $900 | Implemented |
UM0177 # 01 Y:2001 | 01 | 2001 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $5,246 | $11,850 | Not Implemented |
UM0177 # 07 Y:2001 | 07 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $14,000 | $0 | Implemented |
UM0177 # 06 Y:2001 | 06 | 2001 | RECYCLE CASTING SAND | $48,000 | $0 | Implemented |
UM0177 # 05 Y:2001 | 05 | 2001 | RECOVER METALS FROM CASTING SAND | $64,000 | $0 | Not Implemented |
UM0177 # 04 Y:2001 | 04 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,480 | $27,000 | Implemented |
UM0177 # 03 Y:2001 | 03 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,663 | $4,200 | Not Implemented |
UM0177 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,577 | $950 | Implemented |