IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 3325 Steel Foundries, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0819 # 08 Y:2012 08 2012 INSTALL EQUIPMENT TO MOVE PRODUCT $296,539 $350,000 Implemented
OK0819 # 07 Y:2012 07 2012 INSTALL TIMERS AND/OR THERMOSTATS $102 $353 Implemented
OK0819 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,466 $0 Not Implemented
OK0819 # 05 Y:2012 05 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,206 $29,250 Implemented
OK0819 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,633 $560 Implemented
OK0819 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $199 $556 Implemented
OK0819 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,891 $16,296 Not Implemented
OK0819 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,728 $10,884 Not Implemented
OK0525 # 02 Y:1997 02 1997 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $9,080 $1,260 Not Implemented
OK0525 # 09 Y:1997 09 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $28,080 $2,090 Not Implemented
OK0525 # 08 Y:1997 08 1997 INSTALL OCCUPANCY SENSORS $134 $116 Implemented
OK0525 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $147 $278 Not Implemented
OK0525 # 06 Y:1997 06 1997 IMPROVE COMBUSTION CONTROL CAPABILITY $1,033 $2,805 Not Implemented
OK0525 # 05 Y:1997 05 1997 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,850 $4,477 Not Implemented
OK0525 # 04 Y:1997 04 1997 INSTALL SET-BACK TIMERS $3,150 $630 Implemented
OK0525 # 03 Y:1997 03 1997 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $5,369 $6,768 Implemented
OK0525 # 01 Y:1997 01 1997 RECYCLE CASTING SAND $290,422 $282,500 Not Implemented
OK0238 # 07 Y:1987 07 1987 RECOVER WASTE HEAT FROM EQUIPMENT $3,369 $1,219 Not Implemented
OK0238 # 06 Y:1987 06 1987 USE OPTIMUM THICKNESS INSULATION $1,643 $6,000 Not Implemented
OK0238 # 05 Y:1987 05 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,923 $28,665 Not Implemented
OK0238 # 04 Y:1987 04 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,068 $2,500 Not Implemented
OK0238 # 03 Y:1987 03 1987 INSTALL TIMERS AND/OR THERMOSTATS $17,160 $1,500 Not Implemented
OK0238 # 02 Y:1987 02 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $964 $0 Not Implemented
OK0238 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $263 $105 Not Implemented
OK0230 # 05 Y:1987 05 1987 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $23,577 $4,125 Implemented