IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

256

matching recommendations
Reset
SIC 333 Primary Nonferrous Metals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0256 # 04 Y:2024 04 2024 REDUCE EXCESSIVE BOILER BLOWDOWN $5,024 $7,960 n/a
UU0256 # 03 Y:2024 03 2024 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,048 $11,730 n/a
UU0256 # 01 Y:2024 01 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $43,875 $401,481 n/a
UU0256 # 02 Y:2024 02 2024 OPTIMIZE PLANT POWER FACTOR $14,319 $31,625 n/a
AS0565 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $583,260 $500 Implemented
AS0565 # 04 Y:2023 04 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,687 $3,351 Not Implemented
AS0565 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $139,376 $1,265,613 Implemented
AS0565 # 06 Y:2023 06 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $617 $312 Not Implemented
AS0565 # 03 Y:2023 03 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $89,587 $918,750 Not Implemented
AS0565 # 07 Y:2023 07 2023 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $454 $720 Implemented
AS0565 # 05 Y:2023 05 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $1,336 $75 Implemented
MA0827 # 04 Y:2021 04 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,685 $2,000 Implemented
MA0827 # 07 Y:2021 07 2021 INSULATE BARE EQUIPMENT $801 $1,550 Not Implemented
MA0827 # 01 Y:2021 01 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $32,062 $75,000 Not Implemented
MA0827 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,022 $11,050 Not Implemented
MA0827 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,909 $26,950 Implemented
MA0827 # 06 Y:2021 06 2021 MINIMIZE WATER USAGE $1,374 $3,230 Not Implemented
MA0827 # 05 Y:2021 05 2021 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,962 $10,800 Not Implemented
UU0177 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,132 $22,614 Not Implemented
UU0177 # 09 Y:2021 09 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,497 $100 Implemented
UU0177 # 10 Y:2021 10 2021 INSTALL OCCUPANCY SENSORS $1,441 $1,625 Not Implemented
UU0177 # 01 Y:2021 01 2021 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $57,706 $128,174 Not Implemented
UU0177 # 03 Y:2021 03 2021 USE RADIANT HEATER FOR SPOT HEATING $32,792 $101,000 Not Implemented
UU0177 # 05 Y:2021 05 2021 OPTIMIZE PLANT POWER FACTOR $10,455 $14,250 Implemented
UU0177 # 02 Y:2021 02 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $36,240 $6,760 Implemented