Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
256
matching recommendationsSIC | 333 | Primary Nonferrous Metals |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0256 # 04 Y:2024 | 04 | 2024 | REDUCE EXCESSIVE BOILER BLOWDOWN | $5,024 | $7,960 | n/a |
UU0256 # 03 Y:2024 | 03 | 2024 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,048 | $11,730 | n/a |
UU0256 # 01 Y:2024 | 01 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $43,875 | $401,481 | n/a |
UU0256 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $14,319 | $31,625 | n/a |
AS0565 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $583,260 | $500 | Implemented |
AS0565 # 04 Y:2023 | 04 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,687 | $3,351 | Not Implemented |
AS0565 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $139,376 | $1,265,613 | Implemented |
AS0565 # 06 Y:2023 | 06 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $617 | $312 | Not Implemented |
AS0565 # 03 Y:2023 | 03 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $89,587 | $918,750 | Not Implemented |
AS0565 # 07 Y:2023 | 07 | 2023 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $454 | $720 | Implemented |
AS0565 # 05 Y:2023 | 05 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $1,336 | $75 | Implemented |
MA0827 # 04 Y:2021 | 04 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,685 | $2,000 | Implemented |
MA0827 # 07 Y:2021 | 07 | 2021 | INSULATE BARE EQUIPMENT | $801 | $1,550 | Not Implemented |
MA0827 # 01 Y:2021 | 01 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $32,062 | $75,000 | Not Implemented |
MA0827 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,022 | $11,050 | Not Implemented |
MA0827 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,909 | $26,950 | Implemented |
MA0827 # 06 Y:2021 | 06 | 2021 | MINIMIZE WATER USAGE | $1,374 | $3,230 | Not Implemented |
MA0827 # 05 Y:2021 | 05 | 2021 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,962 | $10,800 | Not Implemented |
UU0177 # 06 Y:2021 | 06 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,132 | $22,614 | Not Implemented |
UU0177 # 09 Y:2021 | 09 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,497 | $100 | Implemented |
UU0177 # 10 Y:2021 | 10 | 2021 | INSTALL OCCUPANCY SENSORS | $1,441 | $1,625 | Not Implemented |
UU0177 # 01 Y:2021 | 01 | 2021 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $57,706 | $128,174 | Not Implemented |
UU0177 # 03 Y:2021 | 03 | 2021 | USE RADIANT HEATER FOR SPOT HEATING | $32,792 | $101,000 | Not Implemented |
UU0177 # 05 Y:2021 | 05 | 2021 | OPTIMIZE PLANT POWER FACTOR | $10,455 | $14,250 | Implemented |
UU0177 # 02 Y:2021 | 02 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $36,240 | $6,760 | Implemented |