Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsSIC | 333 | Primary Nonferrous Metals |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0256 # 04 Y:2024 | 04 | 2024 | REDUCE EXCESSIVE BOILER BLOWDOWN | $5,024 | $7,960 | n/a |
UU0256 # 03 Y:2024 | 03 | 2024 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,048 | $11,730 | n/a |
UU0256 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $14,319 | $31,625 | n/a |
UU0256 # 01 Y:2024 | 01 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $43,875 | $401,481 | n/a |
UU0177 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,515 | $5,046 | Implemented |
UU0177 # 10 Y:2021 | 10 | 2021 | INSTALL OCCUPANCY SENSORS | $1,441 | $1,625 | Not Implemented |
UU0177 # 09 Y:2021 | 09 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,497 | $100 | Implemented |
UU0177 # 08 Y:2021 | 08 | 2021 | REDUCE VENTILATION AIR | $4,129 | $4,000 | Implemented |
UU0177 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,105 | $11,650 | Implemented |
UU0177 # 06 Y:2021 | 06 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,132 | $22,614 | Not Implemented |
UU0177 # 05 Y:2021 | 05 | 2021 | OPTIMIZE PLANT POWER FACTOR | $10,455 | $14,250 | Implemented |
UU0177 # 03 Y:2021 | 03 | 2021 | USE RADIANT HEATER FOR SPOT HEATING | $32,792 | $101,000 | Not Implemented |
UU0177 # 02 Y:2021 | 02 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $36,240 | $6,760 | Implemented |
UU0177 # 01 Y:2021 | 01 | 2021 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $57,706 | $128,174 | Not Implemented |
UU0026 # 01 Y:2002 | 01 | 2002 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $4,189 | $0 | Not Implemented |
UU0026 # 07 Y:2002 | 07 | 2002 | RECOVER AND REUSE WASTE MATERIAL | $1,499 | $0 | Not Implemented |
UU0026 # 06 Y:2002 | 06 | 2002 | IMPROVE COMBUSTION CONTROL CAPABILITY | $260 | $1,200 | Not Implemented |
UU0026 # 05 Y:2002 | 05 | 2002 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $10,389 | $2,110 | Not Implemented |
UU0026 # 04 Y:2002 | 04 | 2002 | OPTIMIZE PLANT POWER FACTOR | $3,197 | $3,100 | Not Implemented |
UU0026 # 03 Y:2002 | 03 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,573 | $0 | Implemented |
UU0026 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $31,788 | $2,667 | Not Implemented |