IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

469

matching recommendations
Reset
SIC 334 Secondary Nonferrous Metals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0099 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $2,144 $2,080 Implemented
MZ0099 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,582 $33,200 Implemented
MZ0099 # 01 Y:2012 01 2012 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $43,935 $92,930 Implemented
WV0438 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,104 $107,167 Not Implemented
WV0438 # 02 Y:2011 02 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $26,986 $25,242 Not Implemented
WV0438 # 03 Y:2011 03 2011 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $23,750 $68,377 Not Implemented
WV0438 # 04 Y:2011 04 2011 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $14,539 $4,000 Implemented
WV0438 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,808 $24,313 Implemented
WV0438 # 06 Y:2011 06 2011 INSULATE BARE EQUIPMENT $10,092 $2,424 Not Implemented
WV0438 # 07 Y:2011 07 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,963 $2,000 Implemented
WV0438 # 08 Y:2011 08 2011 DEVELOP A REPAIR/REPLACE POLICY $8,588 $629 Implemented
WV0438 # 09 Y:2011 09 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,774 $648 Not Implemented
WV0438 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,332 $359 Implemented
WV0438 # 11 Y:2011 11 2011 INSTALL SET-BACK TIMERS $927 $617 Not Implemented
UM0378 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,490 $31,638 Implemented
UM0378 # 02 Y:2010 02 2010 UPGRADE CONTROLS ON COMPRESSORS $2,693 $3,996 Implemented
UM0378 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $755 $1,000 Implemented
UM0378 # 04 Y:2010 04 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $102 $10 Not Implemented
UM0378 # 05 Y:2010 05 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $68,485 $2,000 Implemented
UM0378 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,599 $1,500 Implemented
UM0378 # 07 Y:2010 07 2010 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,345 $7,800 Implemented
UD0774 # 11 Y:2008 11 2008 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,078 $0 Implemented
UD0774 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,371 $2,250 Implemented
UD0774 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,863 $6,540 Not Implemented
UD0774 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,237 $0 Not Implemented