IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 334 Secondary Nonferrous Metals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0702 # 03 Y:2004 03 2004 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $25,611 $10,795 Implemented
UD0702 # 02 Y:2004 02 2004 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $33,150 $13,800 Not Implemented
UD0702 # 01 Y:2004 01 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $111,296 $120,000 Not Implemented
UD0702 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,166 $106,664 Not Implemented
UD0702 # 05 Y:2004 05 2004 MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS $11,155 $11,025 Not Implemented
UD0702 # 07 Y:2004 07 2004 UPGRADE CONTROLS ON COMPRESSORS $3,625 $0 Implemented
UD0702 # 09 Y:2004 09 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,215 $600 Not Implemented
UD0702 # 10 Y:2004 10 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $892 $114 Implemented
UD0702 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,961 $92 Implemented
UD0702 # 06 Y:2004 06 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,969 $3,010 Not Implemented
AS0385 # 02 Y:2004 02 2004 ELIMINATE/REDUCE AN OPERATION $151,757 $37,000 Not Implemented
AS0385 # 08 Y:2004 08 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $339 $150 Not Implemented
AS0385 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,939 $60 Not Implemented
AS0385 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $383 $30 Not Implemented
AS0385 # 05 Y:2004 05 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $719 $506 Not Implemented
AS0385 # 04 Y:2004 04 2004 REPROCESS SPENT OILS ON SITE FOR RE-USE $42,444 $17,685 Not Implemented
AS0385 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $59,563 $24,322 Not Implemented
AS0385 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,304 $10,000 Not Implemented
IC0082 # 04 Y:2004 04 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $54,932 $8,421 Implemented
IC0082 # 05 Y:2004 05 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,283 $1,450 Implemented
IC0082 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $24,495 $470,000 Not Implemented
IC0082 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $311 $282,150 Implemented
IC0082 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $516 $600,000 Not Implemented
IC0082 # 03 Y:2004 03 2004 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $295,385 $90,783 Implemented
IC0082 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $212,513 $1,533 Not Implemented