IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

438

matching recommendations
Reset
SIC 3341 Secondary Nonferrous Metals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1313 # 15 Y:2013 15 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $913 $2,119 Not Implemented
UK1313 # 16 Y:2013 16 2013 INSULATE BARE EQUIPMENT $6,807 $894 Not Implemented
UK1313 # 17 Y:2013 17 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,679 $5,000 Not Implemented
UK1313 # 18 Y:2013 18 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $21,538 $2,500 Not Implemented
UK1313 # 19 Y:2013 19 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $252,538 $210,000 Implemented
UK1313 # 20 Y:2013 20 2013 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $412 $0 Implemented
UK1313 # 21 Y:2013 21 2013 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $4,400 $0 Implemented
MZ0126 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,531 $32,100 Not Implemented
MZ0126 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $3,501 $780 Implemented
MZ0126 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,939 $770 Not Implemented
MZ0126 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $328 $575 Not Implemented
MZ0107 # 07 Y:2013 07 2013 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $2,484 $1,261 Not Implemented
MZ0107 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,600 $1,745 Implemented
MZ0107 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $4,907 $3,080 Implemented
MZ0107 # 04 Y:2013 04 2013 USE OPTIMUM THICKNESS INSULATION $6,130 $1,825 Implemented
MZ0107 # 03 Y:2013 03 2013 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $12,972 $3,240 Not Implemented
MZ0107 # 02 Y:2013 02 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $43,709 $1,000 Implemented
MZ0107 # 01 Y:2013 01 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $76,156 $80,528 Not Implemented
MZ0107 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,356 $710 Implemented
MZ0107 # 09 Y:2013 09 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,541 $1,810 Implemented
MZ0107 # 10 Y:2013 10 2013 USE OPTIMUM THICKNESS INSULATION $1,288 $1,499 Implemented
MZ0107 # 11 Y:2013 11 2013 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $845 $1,115 Implemented
MZ0107 # 12 Y:2013 12 2013 USE PHOTOCELL CONTROLS $265 $320 Implemented
MZ0099 # 05 Y:2012 05 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $3,108 $22,500 Implemented
MZ0099 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,358 $940 Implemented