Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsSIC | 3341 | Secondary Nonferrous Metals |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0385 # 02 Y:2004 | 02 | 2004 | ELIMINATE/REDUCE AN OPERATION | $151,757 | $37,000 | Not Implemented |
AS0385 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $59,563 | $24,322 | Not Implemented |
AS0385 # 04 Y:2004 | 04 | 2004 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $42,444 | $17,685 | Not Implemented |
AS0385 # 05 Y:2004 | 05 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $719 | $506 | Not Implemented |
AS0385 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $383 | $30 | Not Implemented |
AS0385 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,939 | $60 | Not Implemented |
AS0385 # 08 Y:2004 | 08 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $339 | $150 | Not Implemented |
AS0385 # 01 Y:2004 | 01 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $21,304 | $10,000 | Not Implemented |
IC0082 # 04 Y:2004 | 04 | 2004 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $54,932 | $8,421 | Implemented |
IC0082 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $516 | $600,000 | Not Implemented |
IC0082 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $311 | $282,150 | Implemented |
IC0082 # 06 Y:2004 | 06 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $24,495 | $470,000 | Not Implemented |
IC0082 # 05 Y:2004 | 05 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,283 | $1,450 | Implemented |
IC0082 # 03 Y:2004 | 03 | 2004 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $295,385 | $90,783 | Implemented |
IC0082 # 02 Y:2004 | 02 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $212,513 | $1,533 | Not Implemented |
IC0082 # 01 Y:2004 | 01 | 2004 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $158,811 | $0 | Implemented |
LE0176 # 01 Y:2004 | 01 | 2004 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $114,214 | $25,000 | Implemented |
LE0176 # 02 Y:2004 | 02 | 2004 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $20,766 | $1,500 | Not Implemented |
LE0176 # 03 Y:2004 | 03 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $19,851 | $1,000 | Not Implemented |
LE0176 # 04 Y:2004 | 04 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,480 | $5,000 | Not Implemented |
LE0176 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $11,003 | $1,000 | Implemented |
LE0176 # 06 Y:2004 | 06 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,825 | $0 | Implemented |
LE0176 # 07 Y:2004 | 07 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $985 | $0 | Not Implemented |