IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

845

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0257 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,834 $281,530 Implemented
WV0257 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $18,309 $36,855 Implemented
WV0257 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,738 $220 Implemented
WV0257 # 09 Y:2003 09 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $37,016 $1,000 Implemented
WV0257 # 11 Y:2003 11 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,974 $6,300 Implemented
WV0257 # 12 Y:2003 12 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $19,542 $1,375 Implemented
WV0257 # 13 Y:2003 13 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $538 $2,900 Implemented
WV0257 # 14 Y:2003 14 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $954 $110 Implemented
UM0227 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,000 $1,725 Implemented
UM0227 # 07 Y:2003 07 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,640 $1,300 Implemented
SU0154 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $692 $133 Implemented
SU0154 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $134 $120 Implemented
SD0313 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,860 $160 Implemented
SD0310 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,878 $280 Implemented
SD0310 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,797 $0 Implemented
SD0310 # 09 Y:2003 09 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,770 $0 Implemented
NC0251 # 04 Y:2002 04 2002 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $6,367 $10,000 Implemented
NC0251 # 05 Y:2002 05 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $4,768 $10,000 Implemented
NC0251 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $137 $574 Implemented
CO0510 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,580 $600 Implemented
CO0510 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $3,600 $1,560 Implemented
CO0510 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $320 $480 Implemented
CO0510 # 06 Y:2002 06 2002 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,900 $250 Implemented
BD0214 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,378 $700 Implemented
BD0214 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $222 $215 Implemented