Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0834 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,600 $18,285 Not Implemented
OK0834 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $1,900 $900 Not Implemented
OK0834 # 04 Y:2012 04 2012 KEEP BOILER TUBES CLEAN $810 $500 Implemented
OK0834 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,755 $1,500 Implemented
OK0834 # 06 Y:2012 06 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,509 $2,000 Not Implemented
OK0834 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,772 $13,200 Not Implemented
OK0834 # 08 Y:2012 08 2012 UPGRADE CONTROLS ON COMPRESSORS $4,641 $0 Implemented
OK0834 # 09 Y:2012 09 2012 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $5,100 $0 Not Implemented
OK0834 # 01 Y:2012 01 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,800 $0 Implemented
TT0047 # 01 Y:2010 01 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $718 $800 Not Implemented
TT0047 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,075 $4,900 Not Implemented
TT0047 # 05 Y:2010 05 2010 DEVELOP A REPAIR/REPLACE POLICY $986 $4,797 Not Implemented
TT0047 # 03 Y:2010 03 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,988 $0 Not Implemented
TT0047 # 04 Y:2010 04 2010 REPAIR OR REPLACE STEAM TRAPS $4,851 $1,600 Not Implemented
MS0204 # 01 Y:2002 01 2002 PREHEAT COMBUSTION AIR WITH WASTE HEAT $97,931 $34,200 Not Implemented
MS0204 # 02 Y:2002 02 2002 PREHEAT COMBUSTION AIR WITH WASTE HEAT $10,266 $5,760 Not Implemented
MS0204 # 03 Y:2002 03 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,500 $3,763 Not Implemented
MS0204 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,399 $331 Not Implemented
MS0204 # 05 Y:2002 05 2002 LOWER CEILING TO REDUCE CONDITIONED SPACE $3,771 $1,000 Not Implemented
MS0204 # 06 Y:2002 06 2002 INSTALL TIMERS AND/OR THERMOSTATS $1,549 $2,030 Not Implemented
MS0204 # 07 Y:2002 07 2002 DISCONNECT BALLASTS $129 $256 Implemented
MS0204 # 08 Y:2002 08 2002 PAY BILLS ON TIME TO AVOID LATE FEES $89 $25 Implemented
OK0616 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $17,387 $4,428 Implemented
OK0616 # 01 Y:2001 01 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $447 $2,790 Not Implemented
OK0616 # 06 Y:2001 06 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,349 $21,884 Not Implemented