IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,036

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0834 # 06 Y:2012 06 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,509 $2,000 Not Implemented
OK0834 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,772 $13,200 Not Implemented
OK0834 # 08 Y:2012 08 2012 UPGRADE CONTROLS ON COMPRESSORS $4,641 $0 Implemented
OK0834 # 09 Y:2012 09 2012 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $5,100 $0 Not Implemented
TT0095 # 01 Y:2012 01 2012 REPLACE BOILER $8,685 $5,000 Implemented
TT0095 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $165,758 $300,000 Not Implemented
TT0095 # 03 Y:2012 03 2012 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $9,681 $50,000 Not Implemented
TT0095 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $1,770 $1,195 Implemented
TT0095 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,668 $7,000 Implemented
TT0095 # 06 Y:2012 06 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $190 $10 Not Implemented
TT0095 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $39,751 $33,080 Implemented
TT0095 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $538 $625 Not Implemented
TT0095 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,067 $8,672 Not Implemented
SU0315 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,327 $0 Not Implemented
SU0315 # 02 Y:2012 02 2012 RECOVER AND REUSE SPENT ACID BATHS $28,847 $792 Not Implemented
SU0315 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,269 $1,357 Not Implemented
SU0315 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $317 $140 Not Implemented
SU0315 # 05 Y:2012 05 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $149 $652 Not Implemented
SU0315 # 06 Y:2012 06 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $33,502 $167,290 Not Implemented
SU0315 # 07 Y:2012 07 2012 OPTIMIZE PLANT POWER FACTOR $8,366 $42,403 Not Implemented
SU0315 # 08 Y:2012 08 2012 UPGRADE OBSOLETE EQUIPMENT $82 $436 Not Implemented
GT0888 # 01 Y:2012 01 2012 USE SYNTHETIC LUBRICANT $32,596 $0 Not Implemented
GT0888 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $100 $0 Not Implemented
GT0888 # 03 Y:2012 03 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,563 $2,250 Not Implemented
GT0888 # 04 Y:2012 04 2012 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,915 $1,680 Not Implemented