IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,036

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0323 # 06 Y:2003 06 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $76,790 $65 Implemented
UF0323 # 07 Y:2003 07 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,852 $618 Not Implemented
UF0323 # 08 Y:2003 08 2003 INSTALL OCCUPANCY SENSORS $1,385 $831 Not Implemented
UF0323 # 09 Y:2003 09 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $774 $3,496 Not Implemented
UF0323 # 10 Y:2003 10 2003 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $69,343 $420,000 Implemented
UU0042 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $15,620 $8,000 Not Implemented
UU0042 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,027 $1,500 Not Implemented
UU0042 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $632 $550 Not Implemented
UU0042 # 04 Y:2003 04 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,960 $0 Not Implemented
UU0042 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,836 $20,051 Not Implemented
UU0042 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $420 $406 Not Implemented
UU0042 # 07 Y:2003 07 2003 RECOVER WASTE HEAT FROM EQUIPMENT $792 $2,296 Not Implemented
UU0042 # 08 Y:2003 08 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $14,607 $100,240 Not Implemented
UU0041 # 01 Y:2003 01 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,352 $2,000 n/a
UU0041 # 02 Y:2003 02 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,207 $3,500 n/a
UU0041 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $1,080 $950 n/a
UU0041 # 04 Y:2003 04 2003 OPTIMIZE PLANT POWER FACTOR $31,340 $45,900 n/a
UU0041 # 05 Y:2003 05 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,860 $0 n/a
UU0041 # 06 Y:2003 06 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $748 $0 n/a
WV0257 # 01 Y:2003 01 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,914 $1,100 Not Implemented
WV0257 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,020 $0 Implemented
WV0257 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,834 $281,530 Implemented
WV0257 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $18,309 $36,855 Implemented
WV0257 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,497 $335 Not Implemented
WV0257 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,738 $220 Implemented