Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,036
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0487 # 05 Y:2020 | 05 | 2020 | USE PHOTOCELL CONTROLS | $12,092 | $5,188 | Not Implemented |
LE0494 # 01 Y:2020 | 01 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $3,038 | $1,620 | Implemented |
LE0494 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,651 | $13,000 | Not Implemented |
LE0494 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,586 | $11,000 | Not Implemented |
LE0494 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,225 | $8,000 | Not Implemented |
LE0494 # 05 Y:2020 | 05 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $22,684 | $35,000 | Not Implemented |
LE0494 # 06 Y:2020 | 06 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,199 | $10,000 | Not Implemented |
LE0494 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,702 | $43,257 | Not Implemented |
LE0494 # 08 Y:2020 | 08 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,873 | $27,900 | Not Implemented |
TR0023 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,791 | $1,500 | Implemented |
TR0023 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,401 | $9,785 | Implemented |
TR0023 # 03 Y:2020 | 03 | 2020 | METER WASTE WATER | $7,020 | $1,511 | Implemented |
LS1912 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,696 | $50 | Not Implemented |
LS1912 # 02 Y:2019 | 02 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,767 | $150 | Not Implemented |
LS1912 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,179 | $630 | Not Implemented |
LS1912 # 04 Y:2019 | 04 | 2019 | INSTALL AUTOMATIC PACKING EQUIPMENT | $1,164,856 | $900,000 | Not Implemented |
LS1912 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,700 | $46,200 | Not Implemented |
LS1912 # 06 Y:2019 | 06 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,657 | $2,850 | Not Implemented |
LS1912 # 07 Y:2019 | 07 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $515 | $1,198 | Not Implemented |
UK1901 # 01 Y:2019 | 01 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,739 | $5,715 | Not Implemented |
UK1901 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,381 | $750 | Implemented |
UK1901 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,843 | $2,270 | Implemented |
UK1901 # 04 Y:2019 | 04 | 2019 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $22,646 | $20,000 | Not Implemented |
UK1901 # 05 Y:2019 | 05 | 2019 | INSTALL OCCUPANCY SENSORS | $507 | $245 | Implemented |
UK1901 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $283 | $520 | Implemented |