Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
171
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0643 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $55,833 | $125,021 | Not Implemented |
SD0643 # 06 Y:2024 | 06 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $6,190 | $4,926 | Not Implemented |
SD0643 # 03 Y:2024 | 03 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $11,390 | $0 | Not Implemented |
SD0643 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM TEMPERATURE | $6,846 | $0 | Implemented |
SD0643 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $338 | $424 | Implemented |
SD0643 # 05 Y:2024 | 05 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,058 | $4,196 | Not Implemented |
SD0643 # 08 Y:2024 | 08 | 2024 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $1,956 | $2,000 | Not Implemented |
SD0643 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $489 | $250 | Implemented |
SF0586 # 05 Y:2022 | 05 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $35,916 | $68,135 | Implemented |
SF0586 # 01 Y:2022 | 01 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,887 | $0 | Implemented |
SF0586 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,428 | $26,487 | Implemented |
SF0586 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,736 | $14,830 | Implemented |
SF0586 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,868 | $0 | Implemented |
SF0586 # 06 Y:2022 | 06 | 2022 | INSULATE BARE EQUIPMENT | $1,974 | $4,260 | Implemented |
SF0586 # 08 Y:2022 | 08 | 2022 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $62,090 | $317,631 | Implemented |
SF0586 # 03 Y:2022 | 03 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $38,078 | $22,361 | Implemented |
SD0506 # 05 Y:2011 | 05 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,973 | $9,260 | Not Implemented |
SD0506 # 06 Y:2011 | 06 | 2011 | INSTALL SKYLIGHTS | $3,045 | $6,027 | Not Implemented |
SD0506 # 01 Y:2011 | 01 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,173 | $100 | Not Implemented |
SD0506 # 04 Y:2011 | 04 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,431 | $2,923 | Implemented |
SD0506 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,408 | $600 | Implemented |
SD0506 # 07 Y:2011 | 07 | 2011 | INSTALL OCCUPANCY SENSORS | $563 | $1,476 | Implemented |
SD0506 # 03 Y:2011 | 03 | 2011 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $281 | $100 | Not Implemented |
SD0313 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,447 | $14,000 | Not Implemented |
SD0313 # 01 Y:2003 | 01 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $58,217 | $20,000 | Not Implemented |