IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

171

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0643 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $55,833 $125,021 Not Implemented
SD0643 # 06 Y:2024 06 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $6,190 $4,926 Not Implemented
SD0643 # 03 Y:2024 03 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $11,390 $0 Not Implemented
SD0643 # 04 Y:2024 04 2024 USE OPTIMUM TEMPERATURE $6,846 $0 Implemented
SD0643 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $338 $424 Implemented
SD0643 # 05 Y:2024 05 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,058 $4,196 Not Implemented
SD0643 # 08 Y:2024 08 2024 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $1,956 $2,000 Not Implemented
SD0643 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $489 $250 Implemented
SF0586 # 05 Y:2022 05 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $35,916 $68,135 Implemented
SF0586 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,887 $0 Implemented
SF0586 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,428 $26,487 Implemented
SF0586 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,736 $14,830 Implemented
SF0586 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,868 $0 Implemented
SF0586 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $1,974 $4,260 Implemented
SF0586 # 08 Y:2022 08 2022 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $62,090 $317,631 Implemented
SF0586 # 03 Y:2022 03 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $38,078 $22,361 Implemented
SD0506 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,973 $9,260 Not Implemented
SD0506 # 06 Y:2011 06 2011 INSTALL SKYLIGHTS $3,045 $6,027 Not Implemented
SD0506 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,173 $100 Not Implemented
SD0506 # 04 Y:2011 04 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,431 $2,923 Implemented
SD0506 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,408 $600 Implemented
SD0506 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $563 $1,476 Implemented
SD0506 # 03 Y:2011 03 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $281 $100 Not Implemented
SD0313 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,447 $14,000 Not Implemented
SD0313 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $58,217 $20,000 Not Implemented