IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0510 # 06 Y:2002 06 2002 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,900 $250 Implemented
CO0510 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $320 $480 Implemented
CO0510 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $3,600 $1,560 Implemented
CO0510 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,580 $600 Implemented
CO0476 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,240 $2,400 Implemented
CO0476 # 03 Y:2000 03 2000 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $2,310 $1,000 Implemented
CO0476 # 04 Y:2000 04 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $62,600 $18,400 Implemented
CO0473 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,150 $400 Implemented
CO0473 # 08 Y:2000 08 2000 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $39,460 $10,000 Implemented
CO0473 # 07 Y:2000 07 2000 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $107,610 $75,000 Implemented
CO0473 # 06 Y:2000 06 2000 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,260 $500 Implemented
CO0473 # 05 Y:2000 05 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,180 $6,780 Implemented
CO0473 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,980 $1,000 Implemented
CO0473 # 03 Y:2000 03 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,360 $10,000 Implemented
CO0473 # 01 Y:2000 01 2000 IMPROVE COMBUSTION CONTROL CAPABILITY $74,960 $1,050 Implemented
CO0227 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $632 $275 Implemented
CO0227 # 06 Y:1991 06 1991 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,500 $20,650 Implemented
CO0227 # 05 Y:1991 05 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,897 $3,595 Implemented
CO0227 # 04 Y:1991 04 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,080 $23,725 Implemented
CO0227 # 03 Y:1991 03 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,890 $4,720 Implemented
CO0227 # 02 Y:1991 02 1991 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $7,150 $3,500 Implemented