IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0437 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,582 $0 Implemented
KU0402 # 02 Y:1993 02 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $4,617 $3,517 Implemented
KU0402 # 03 Y:1993 03 1993 INSTALL SET-BACK TIMERS $3,940 $1,000 Implemented
KU0245 # 01 Y:1988 01 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $33,489 $50,000 Implemented
KU0245 # 03 Y:1988 03 1988 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,396 $4,000 Implemented
KU0245 # 04 Y:1988 04 1988 COVER OPEN TANKS $2,670 $400 Implemented
KU0245 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $311 $162 Implemented
KU0245 # 06 Y:1988 06 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $760 $0 Implemented
KU0245 # 07 Y:1988 07 1988 INSTALL TURBULATORS $724 $960 Implemented
KU0245 # 08 Y:1988 08 1988 INSULATE BARE EQUIPMENT $656 $840 Implemented
KU0245 # 10 Y:1988 10 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $499 $0 Implemented
KU0245 # 11 Y:1988 11 1988 INSTALL AUTOMATIC STACK DAMPER $398 $700 Implemented
KU0241 # 02 Y:1987 02 1987 INSTALL TIMERS AND/OR THERMOSTATS $15,123 $6,000 Implemented
KU0241 # 01 Y:1987 01 1987 IMPROVE LUBRICATION PRACTICES $10,902 $0 Implemented
KU0241 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,831 $3,786 Implemented
KU0241 # 04 Y:1987 04 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,027 $7,700 Implemented
KU0241 # 05 Y:1987 05 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,422 $0 Implemented
KU0241 # 06 Y:1987 06 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,159 $500 Implemented
KU0149 # 16 Y:1984 16 1984 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $3,367 $30 Implemented
KU0149 # 20 Y:1984 20 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $310 $550 Implemented
KU0149 # 21 Y:1984 21 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $278 $0 Implemented
KU0149 # 09 Y:1984 09 1984 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,551 $300 Implemented
KU0149 # 25 Y:1984 25 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,579 $500 Implemented
KU0149 # 03 Y:1984 03 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $965 $400 Implemented
KU0149 # 02 Y:1984 02 1984 INSULATE BARE EQUIPMENT $3,920 $350 Implemented