IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0716 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,289 $1,500 Implemented
OR0716 # 02 Y:2019 02 2019 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $96,953 $165,004 Implemented
OR0716 # 01 Y:2019 01 2019 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $170,737 $8,015 Not Implemented
OR0716 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,971 $1,200 Implemented
OR0716 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,967 $10,000 Implemented
OR0716 # 07 Y:2019 07 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,641 $23,504 Not Implemented
OR0716 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $9,287 $19,796 Not Implemented
OR0684 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $5,474 $8,100 Implemented
OR0684 # 04 Y:2017 04 2017 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,832 $670 Implemented
OR0684 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $2,196 $1,831 Not Implemented
OR0684 # 02 Y:2017 02 2017 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $17,412 $20,340 Implemented
OR0684 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,985 $500 Not Implemented
OR0684 # 06 Y:2017 06 2017 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $229,046 $405,000 Implemented
OR0684 # 07 Y:2017 07 2017 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $41,279 $86,043 Implemented
OR0684 # 08 Y:2017 08 2017 PURCHASE EQUIPMENT INSTEAD OF LEASING $156,346 $600,000 Not Implemented
OR0539 # 05 Y:2008 05 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,317 $72,600 Not Implemented
OR0539 # 06 Y:2008 06 2008 OPTIMIZE PLANT POWER FACTOR $4,450 $19,950 Not Implemented
OR0539 # 07 Y:2008 07 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,860 $0 Not Implemented
OR0539 # 04 Y:2008 04 2008 USE SOLAR HEAT TO MAKE ELECTRICTY $106,649 $758,330 Not Implemented
OR0539 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $5,432 $23,075 Not Implemented
OR0539 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $87,200 $43,600 Not Implemented
OR0539 # 11 Y:2008 11 2008 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $52,540 $2,200 Not Implemented
OR0539 # 12 Y:2008 12 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $46,700 $46,700 Not Implemented
OR0539 # 13 Y:2008 13 2008 UPGRADE CONTROLS ON COMPRESSORS $7,300 $5,700 Not Implemented
OR0539 # 02 Y:2008 02 2008 USE EXISTING DAM TO GENERATE ELECTRICITY $31,589 $50,000 Not Implemented