Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0261 # 09 Y:2021 09 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $703 $850 Not Implemented
TT0261 # 01 Y:2021 01 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $188,912 $733,702 Implemented
TT0261 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $49,358 $3,200 Implemented
TT0261 # 04 Y:2021 04 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $26,082 $700 Implemented
TT0261 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,133 $3,000 Not Implemented
TT0261 # 07 Y:2021 07 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,374 $0 Implemented
TT0261 # 08 Y:2021 08 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,221 $9,600 Not Implemented
TT0261 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,718 $15,000 Not Implemented
TT0261 # 03 Y:2021 03 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $30,912 $38,200 Not Implemented
TT0159 # 02 Y:2015 02 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $19,647 $20,000 Not Implemented
TT0159 # 09 Y:2015 09 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,816 $1,000 Not Implemented
TT0159 # 08 Y:2015 08 2015 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,187 $500 Implemented
TT0159 # 07 Y:2015 07 2015 UPGRADE CONTROLS ON COMPRESSORS $2,995 $1,070 Implemented
TT0159 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,756 $7,500 Not Implemented
TT0159 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,329 $63 Not Implemented
TT0159 # 04 Y:2015 04 2015 INSTALL SPECTRAL REFLECTORS / DELAMP $8,659 $700 Not Implemented
TT0159 # 03 Y:2015 03 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $17,175 $38,170 Not Implemented
TT0159 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,644 $3,000 Implemented
TT0095 # 01 Y:2012 01 2012 REPLACE BOILER $8,685 $5,000 Implemented
TT0095 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $165,758 $300,000 Not Implemented
TT0095 # 03 Y:2012 03 2012 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $9,681 $50,000 Not Implemented
TT0095 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $1,770 $1,195 Implemented
TT0095 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,668 $7,000 Implemented
TT0095 # 06 Y:2012 06 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $190 $10 Not Implemented
TT0095 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $39,751 $33,080 Implemented