Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0261 # 09 Y:2021 | 09 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $703 | $850 | Not Implemented |
TT0261 # 01 Y:2021 | 01 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $188,912 | $733,702 | Implemented |
TT0261 # 08 Y:2021 | 08 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,221 | $9,600 | Not Implemented |
TT0261 # 07 Y:2021 | 07 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,374 | $0 | Implemented |
TT0261 # 06 Y:2021 | 06 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,718 | $15,000 | Not Implemented |
TT0261 # 05 Y:2021 | 05 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,133 | $3,000 | Not Implemented |
TT0261 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $49,358 | $3,200 | Implemented |
TT0261 # 03 Y:2021 | 03 | 2021 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $30,912 | $38,200 | Not Implemented |
TT0261 # 04 Y:2021 | 04 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $26,082 | $700 | Implemented |
TT0159 # 07 Y:2015 | 07 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $2,995 | $1,070 | Implemented |
TT0159 # 09 Y:2015 | 09 | 2015 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,816 | $1,000 | Not Implemented |
TT0159 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,644 | $3,000 | Implemented |
TT0159 # 02 Y:2015 | 02 | 2015 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $19,647 | $20,000 | Not Implemented |
TT0159 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,756 | $7,500 | Not Implemented |
TT0159 # 08 Y:2015 | 08 | 2015 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,187 | $500 | Implemented |
TT0159 # 03 Y:2015 | 03 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $17,175 | $38,170 | Not Implemented |
TT0159 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,329 | $63 | Not Implemented |
TT0159 # 04 Y:2015 | 04 | 2015 | INSTALL SPECTRAL REFLECTORS / DELAMP | $8,659 | $700 | Not Implemented |
TT0095 # 02 Y:2012 | 02 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $165,758 | $300,000 | Not Implemented |
TT0095 # 03 Y:2012 | 03 | 2012 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $9,681 | $50,000 | Not Implemented |
TT0095 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $1,770 | $1,195 | Implemented |
TT0095 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,668 | $7,000 | Implemented |
TT0095 # 06 Y:2012 | 06 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $190 | $10 | Not Implemented |
TT0095 # 07 Y:2012 | 07 | 2012 | INSTALL OCCUPANCY SENSORS | $39,751 | $33,080 | Implemented |
TT0095 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $538 | $625 | Not Implemented |