IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0194 # 05 Y:2000 05 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $4,749 $0 Not Implemented
AR0194 # 04 Y:2000 04 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $13,959 $8,000 Not Implemented
AR0194 # 03 Y:2000 03 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,342 $6,200 Not Implemented
AR0194 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,287 $1,089 Not Implemented
AR0194 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $34,500 $78,525 Not Implemented
CO0476 # 06 Y:2000 06 2000 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $6,490 $41,000 Not Implemented
CO0476 # 05 Y:2000 05 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $16,290 $13,500 Not Implemented
CO0476 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,380 $20,000 Not Implemented
CO0476 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,240 $2,400 Implemented
CO0476 # 03 Y:2000 03 2000 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $2,310 $1,000 Implemented
CO0476 # 04 Y:2000 04 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $62,600 $18,400 Implemented
SD0250 # 10 Y:2000 10 2000 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED $700 $0 Not Implemented
SD0250 # 09 Y:2000 09 2000 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $5,000 $12,500 Not Implemented
SD0250 # 07 Y:2000 07 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $97,460 $135,000 Not Implemented
SD0250 # 08 Y:2000 08 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $11,240 $7,900 Not Implemented
SD0250 # 06 Y:2000 06 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $148,200 $8,000 Not Implemented
SD0250 # 04 Y:2000 04 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,901 $40,000 Not Implemented
SD0250 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $44,752 $600 Implemented
SD0250 # 05 Y:2000 05 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $3,256 $8,000 Not Implemented
SD0250 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,942 $4,100 Not Implemented
SD0250 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $45,106 $210,000 Not Implemented
SF0200 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,619 $2,800 Not Implemented
SF0200 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,122 $13,280 Not Implemented
SF0200 # 02 Y:2000 02 2000 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,726 $7,750 Not Implemented
SF0200 # 05 Y:2000 05 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $16,728 $70,000 Not Implemented