IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UMS013 # 04 Y:2012 04 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $465,000 $700,000 Not Implemented
UMS013 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $320,000 $600,000 Not Implemented
UMS013 # 05 Y:2012 05 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $137,000 $0 Not Implemented
UMS013 # 02 Y:2012 02 2012 DIRECT WARMEST AIR TO COMBUSTION INTAKE $106,000 $200,000 Not Implemented
UMS013 # 03 Y:2012 03 2012 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $673,000 $1,000,000 Not Implemented
AM0622 # 10 Y:2012 10 2012 USE SYNTHETIC LUBRICANT $550 $0 Not Implemented
AM0622 # 03 Y:2012 03 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $25,450 $69,300 Implemented
AM0622 # 02 Y:2012 02 2012 MINIMIZE WATER USAGE $42,000 $7,000 Not Implemented
AM0622 # 01 Y:2012 01 2012 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $80,000 $240,000 Not Implemented
AM0622 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,720 $520 Implemented
AM0622 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,770 $55 Not Implemented
AM0622 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,780 $870 Implemented
AM0622 # 08 Y:2012 08 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,300 $0 Not Implemented
AM0622 # 06 Y:2012 06 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,900 $500 Not Implemented
AM0622 # 09 Y:2012 09 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $560 $0 Implemented
LE0349 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,018 $7,190 Implemented
LE0349 # 08 Y:2012 08 2012 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,074 $5,200 Not Implemented
LE0349 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,510 $12,700 Not Implemented
LE0349 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,052 $200 Implemented
LE0349 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,373 $1,080 Implemented
LE0349 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,253 $1,248 Not Implemented
LE0349 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,249 $40 Not Implemented
LE0349 # 02 Y:2012 02 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $85,383 $310,000 Implemented
OK0834 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,755 $1,500 Implemented
OK0834 # 04 Y:2012 04 2012 KEEP BOILER TUBES CLEAN $810 $500 Implemented