Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
57
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UMS013 # 04 Y:2012 | 04 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $465,000 | $700,000 | Not Implemented |
UMS013 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $320,000 | $600,000 | Not Implemented |
UMS013 # 05 Y:2012 | 05 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $137,000 | $0 | Not Implemented |
UMS013 # 02 Y:2012 | 02 | 2012 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $106,000 | $200,000 | Not Implemented |
UMS013 # 03 Y:2012 | 03 | 2012 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $673,000 | $1,000,000 | Not Implemented |
AM0622 # 10 Y:2012 | 10 | 2012 | USE SYNTHETIC LUBRICANT | $550 | $0 | Not Implemented |
AM0622 # 03 Y:2012 | 03 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $25,450 | $69,300 | Implemented |
AM0622 # 02 Y:2012 | 02 | 2012 | MINIMIZE WATER USAGE | $42,000 | $7,000 | Not Implemented |
AM0622 # 01 Y:2012 | 01 | 2012 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $80,000 | $240,000 | Not Implemented |
AM0622 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,720 | $520 | Implemented |
AM0622 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,770 | $55 | Not Implemented |
AM0622 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,780 | $870 | Implemented |
AM0622 # 08 Y:2012 | 08 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,300 | $0 | Not Implemented |
AM0622 # 06 Y:2012 | 06 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,900 | $500 | Not Implemented |
AM0622 # 09 Y:2012 | 09 | 2012 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $560 | $0 | Implemented |
LE0349 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,018 | $7,190 | Implemented |
LE0349 # 08 Y:2012 | 08 | 2012 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,074 | $5,200 | Not Implemented |
LE0349 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,510 | $12,700 | Not Implemented |
LE0349 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,052 | $200 | Implemented |
LE0349 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,373 | $1,080 | Implemented |
LE0349 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,253 | $1,248 | Not Implemented |
LE0349 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,249 | $40 | Not Implemented |
LE0349 # 02 Y:2012 | 02 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $85,383 | $310,000 | Implemented |
OK0834 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,755 | $1,500 | Implemented |
OK0834 # 04 Y:2012 | 04 | 2012 | KEEP BOILER TUBES CLEAN | $810 | $500 | Implemented |