IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0074 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,888 $292 Implemented
IP0074 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $833 $4 Not Implemented
IP0074 # 04 Y:2016 04 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,398 $951 Implemented
IP0074 # 05 Y:2016 05 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,366 $308 Implemented
IP0074 # 06 Y:2016 06 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $473 $101 Implemented
IP0074 # 07 Y:2016 07 2016 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $20,689 $4,600 Not Implemented
IP0074 # 08 Y:2016 08 2016 APPLY FOR INVESTMENT INCENTIVES $6,707 $5,000 Implemented
IP0074 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,616 $56,725 Implemented
IP0074 # 10 Y:2016 10 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $147,202 $313,184 Not Implemented
IP0074 # 01 Y:2016 01 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $6,256 $0 Not Implemented
NC0575 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,862 $21,540 Not Implemented
NC0575 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $338 $100 Not Implemented
NC0575 # 04 Y:2016 04 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $750 $475 Implemented
NC0575 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,250 $500 Implemented
NC0575 # 02 Y:2016 02 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,087 $100 Implemented
NC0575 # 06 Y:2016 06 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $158 $300 Not Implemented
NC0572 # 07 Y:2016 07 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,387 $100 Not Implemented
NC0572 # 08 Y:2016 08 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $117 $180 Not Implemented
NC0572 # 09 Y:2016 09 2016 DEVELOP A REPAIR/REPLACE POLICY $2,418 $5,865 Not Implemented
NC0572 # 10 Y:2016 10 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $672 $103 Not Implemented
NC0572 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $944 $200 Implemented
NC0572 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $307 $571 Not Implemented
NC0572 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,443 $12,240 Not Implemented
NC0572 # 03 Y:2016 03 2016 USE PHOTOCELL CONTROLS $2,850 $150 Not Implemented
NC0572 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,293 $35,726 Implemented