Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2203 # 02 Y:2022 | 02 | 2022 | INSULATE BARE EQUIPMENT | $4,020 | $7,066 | Not Implemented |
UC2203 # 07 Y:2022 | 07 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $806,860 | $4,875,813 | Not Implemented |
UC2203 # 05 Y:2022 | 05 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,677 | $960 | Not Implemented |
UC2203 # 01 Y:2022 | 01 | 2022 | INSTALL / REPAIR INSULATION ON STEAM LINES | $13,662 | $9,582 | Not Implemented |
UC2203 # 06 Y:2022 | 06 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,588 | $4,500 | Not Implemented |
UC2203 # 03 Y:2022 | 03 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $35,091 | $2,940 | Not Implemented |
UC2203 # 04 Y:2022 | 04 | 2022 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $22,048 | $108,454 | Not Implemented |
UU0206 # 08 Y:2022 | 08 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,802 | $1,125 | Not Implemented |
UU0206 # 09 Y:2022 | 09 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $983 | $375 | Not Implemented |
UU0206 # 07 Y:2022 | 07 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,868 | $1,019 | Implemented |
UU0206 # 06 Y:2022 | 06 | 2022 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,388 | $5,440 | Not Implemented |
UU0206 # 05 Y:2022 | 05 | 2022 | MINIMIZE WATER USAGE | $5,292 | $1,764 | Implemented |
UU0206 # 04 Y:2022 | 04 | 2022 | PAY UTILITY BILLS ON TIME | $23,515 | $750 | Implemented |
UU0206 # 03 Y:2022 | 03 | 2022 | MODIFY STARTUP/SHUTDOWN TIMES | $15,730 | $3,713 | Implemented |
UU0206 # 02 Y:2022 | 02 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $79,430 | $1,500 | Implemented |
UU0206 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $139,892 | $110,800 | Implemented |
SF0586 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,736 | $14,830 | Implemented |
SF0586 # 05 Y:2022 | 05 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $35,916 | $68,135 | Implemented |
SF0586 # 06 Y:2022 | 06 | 2022 | INSULATE BARE EQUIPMENT | $1,974 | $4,260 | Implemented |
SF0586 # 08 Y:2022 | 08 | 2022 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $62,090 | $317,631 | Implemented |
SF0586 # 01 Y:2022 | 01 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,887 | $0 | Implemented |
SF0586 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,868 | $0 | Implemented |
SF0586 # 03 Y:2022 | 03 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $38,078 | $22,361 | Implemented |
SF0586 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,428 | $26,487 | Implemented |
MS0394 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,140 | $111,625 | Not Implemented |