IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

150

matching recommendations
Reset
SIC 3351 Copper Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0358 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $308 $100 Implemented
NC0358 # 01 Y:2007 01 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $6,682 $13,000 Not Implemented
NC0358 # 02 Y:2007 02 2007 DEVELOP A REPAIR/REPLACE POLICY $3,860 $2,751 Not Implemented
NC0358 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $327 $316 Implemented
NC0358 # 06 Y:2007 06 2007 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $767 $1,000 Not Implemented
NC0358 # 07 Y:2007 07 2007 USE PHOTOCELL CONTROLS $187 $200 Not Implemented
NC0358 # 08 Y:2007 08 2007 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $805,000 $56,000 Not Implemented
NC0358 # 03 Y:2007 03 2007 RECOVER WASTE HEAT FROM EQUIPMENT $5,543 $24,660 Not Implemented
MS0294 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,047 $10,811 Not Implemented
MS0294 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,448 $70,420 Not Implemented
MS0294 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,760 $172 Implemented
MS0294 # 01 Y:2006 01 2006 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $93,222 $290,000 Not Implemented
MS0294 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,240 $609 Implemented
MS0294 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,175 $21,180 Not Implemented
MS0294 # 07 Y:2006 07 2006 AIR CONDITION ONLY SPACE NECESSARY $381 $240 Not Implemented
MA0574 # 02 Y:2005 02 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $140,952 $230,000 Implemented
MA0574 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $3,466 $1,801 Implemented
MA0574 # 07 Y:2005 07 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $960 $0 Implemented
MA0574 # 03 Y:2005 03 2005 BURN A LESS EXPENSIVE GRADE OF FUEL $349,295 $54,400 Not Implemented
MA0574 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $2,911 $5,770 Implemented
MA0574 # 01 Y:2005 01 2005 USE RADIANT HEATER FOR SPOT HEATING $179,823 $140,865 Implemented
MA0574 # 04 Y:2005 04 2005 OPTIMIZE PLANT POWER FACTOR $20,725 $20,215 Not Implemented
WV0288 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,469 $2,195 Not Implemented
WV0288 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,141 $360 Implemented
WV0288 # 03 Y:2004 03 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,120 $700 Not Implemented