IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

149

matching recommendations
Reset
SIC 3353 Aluminum Sheet, Plate, And Foil
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0616 # 02 Y:2001 02 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,570 $1,040 Implemented
OK0616 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $17,387 $4,428 Implemented
OK0616 # 04 Y:2001 04 2001 INSTALL COMMON HEADER ON COMPRESSORS $11,108 $7,010 Not Implemented
OK0616 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,001 $25,778 n/a
OK0616 # 06 Y:2001 06 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,349 $21,884 Not Implemented
OK0616 # 07 Y:2001 07 2001 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,930,557 $208,000 n/a
OK0616 # 08 Y:2001 08 2001 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $13,739 $3,900 Not Implemented
OK0616 # 09 Y:2001 09 2001 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $135,553 $58,580 n/a
OK0616 # 10 Y:2001 10 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $540,000 $125,040 Implemented
SD0274 # 01 Y:2001 01 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $126,144 $15,000 n/a
SD0274 # 02 Y:2001 02 2001 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $37,083 $40,000 n/a
SD0274 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $48,575 $10,000 Not Implemented
SD0274 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,911 $440 Implemented
SD0274 # 05 Y:2001 05 2001 USE POWER DURING OFF-PEAK PERIODS $36,091 $0 Implemented
SD0274 # 06 Y:2001 06 2001 INSTALL SKYLIGHTS $18,319 $50,000 Implemented
SD0274 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $1,712 $1,000 Implemented
SD0274 # 08 Y:2001 08 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,260 $8,000 Not Implemented
SD0274 # 09 Y:2001 09 2001 USE OPTIMUM TEMPERATURE $4,364 $0 Implemented
SD0274 # 10 Y:2001 10 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,682 $2,300 Not Implemented
SD0274 # 11 Y:2001 11 2001 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $83,208 $2,000 Not Implemented
SD0274 # 12 Y:2001 12 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $25,500 $20,000 Implemented
SD0274 # 13 Y:2001 13 2001 PAY BILLS ON TIME TO AVOID LATE FEES $3,379 $0 Implemented
SD0274 # 14 Y:2001 14 2001 MODIFY STARTUP/SHUTDOWN TIMES $73,321 $0 Implemented
CO0476 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,380 $20,000 Not Implemented
CO0476 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,240 $2,400 Implemented