IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 3353 Aluminum Sheet, Plate, And Foil
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0204 # 01 Y:2002 01 2002 PREHEAT COMBUSTION AIR WITH WASTE HEAT $97,931 $34,200 Not Implemented
MS0204 # 02 Y:2002 02 2002 PREHEAT COMBUSTION AIR WITH WASTE HEAT $10,266 $5,760 Not Implemented
MS0204 # 03 Y:2002 03 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,500 $3,763 Not Implemented
MS0204 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,399 $331 Not Implemented
MS0204 # 05 Y:2002 05 2002 LOWER CEILING TO REDUCE CONDITIONED SPACE $3,771 $1,000 Not Implemented
MS0204 # 06 Y:2002 06 2002 INSTALL TIMERS AND/OR THERMOSTATS $1,549 $2,030 Not Implemented
MS0204 # 07 Y:2002 07 2002 DISCONNECT BALLASTS $129 $256 Implemented
MS0204 # 08 Y:2002 08 2002 PAY BILLS ON TIME TO AVOID LATE FEES $89 $25 Implemented
OK0616 # 10 Y:2001 10 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $540,000 $125,040 Implemented
OK0616 # 09 Y:2001 09 2001 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $135,553 $58,580 n/a
OK0616 # 08 Y:2001 08 2001 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $13,739 $3,900 Not Implemented
OK0616 # 07 Y:2001 07 2001 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,930,557 $208,000 n/a
OK0616 # 06 Y:2001 06 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,349 $21,884 Not Implemented
OK0616 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,001 $25,778 n/a
OK0616 # 04 Y:2001 04 2001 INSTALL COMMON HEADER ON COMPRESSORS $11,108 $7,010 Not Implemented
OK0616 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $17,387 $4,428 Implemented
OK0616 # 02 Y:2001 02 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,570 $1,040 Implemented
OK0616 # 01 Y:2001 01 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $447 $2,790 Not Implemented
AR0099 # 06 Y:1996 06 1996 MAINTAIN MACHINES TO REDUCE LEAKS $7,300 $600 Implemented
AR0099 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,300 $0 Not Implemented
AR0099 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,537 $200 Implemented
AR0099 # 03 Y:1996 03 1996 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $13,886 $13,040 Implemented
AR0099 # 02 Y:1996 02 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,354 $2,920 Implemented
AR0099 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,044 $1,143 Implemented