Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 3354 Aluminum Extruded Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0596 # 04 Y:2023 04 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $213,087 $0 Implemented
UF0596 # 10 Y:2023 10 2023 IMPROVE SPACE COMFORT CONDITIONING $26,447 $4,768 Implemented
UF0596 # 02 Y:2023 02 2023 INSTALL SUB-METERING EQUIPMENT $266,539 $15,232 Implemented
UF0596 # 05 Y:2023 05 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $145,162 $141,225 Implemented
UF0596 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,499 $1,399 Implemented
UF0596 # 06 Y:2023 06 2023 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $50,904 $49,563 Implemented
UF0596 # 07 Y:2023 07 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $47,000 $171,903 Implemented
UF0596 # 03 Y:2023 03 2023 DIRECT WARMEST AIR TO COMBUSTION INTAKE $232,670 $300,000 Implemented
UF0596 # 11 Y:2023 11 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,156 $2,352 Implemented
UF0596 # 09 Y:2023 09 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,289 $25,440 Implemented
UF0448 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,397 $9,355 Implemented
UF0448 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $3,518 $2,040 Implemented
MI0139 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $3,192 $5,000 Implemented
MI0139 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $26,909 $30 Implemented
MI0139 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,785 $1,074 Implemented
UF0323 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,288 $23,205 Implemented
UF0323 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $26,966 $104,168 Implemented
UF0323 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,475 $370 Implemented
UF0323 # 06 Y:2003 06 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $76,790 $65 Implemented
UF0323 # 10 Y:2003 10 2003 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $69,343 $420,000 Implemented
UF0302 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,992 $550 Implemented
UF0302 # 07 Y:2002 07 2002 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $4,587 $0 Implemented
UF0302 # 05 Y:2002 05 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $2,883 $2,330 Implemented
UF0302 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,265 $3,773 Implemented
MI0033 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,230 $117 Implemented