Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
768
matching recommendationsSIC | 3354 | Aluminum Extruded Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0874 # 07 Y:2023 | 07 | 2023 | USE PHOTOCELL CONTROLS | $1,050 | $960 | Implemented |
AM0874 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,860 | $3,000 | Implemented |
AM0874 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $18,060 | $430 | Implemented |
AM0874 # 03 Y:2023 | 03 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $10,850 | $4,340 | Implemented |
AM0874 # 04 Y:2023 | 04 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $49,585 | $3,600 | Implemented |
UU0196 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,096 | $323 | Implemented |
UU0196 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,577 | $2,577 | Not Implemented |
UU0196 # 01 Y:2022 | 01 | 2022 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $10,923 | $250 | Implemented |
UU0196 # 03 Y:2022 | 03 | 2022 | INSTALL OCCUPANCY SENSORS | $1,732 | $7,647 | Implemented |
UU0196 # 06 Y:2022 | 06 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $510 | $640 | Implemented |
UU0196 # 05 Y:2022 | 05 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $779 | $750 | Implemented |
TR0023 # 03 Y:2020 | 03 | 2020 | METER WASTE WATER | $7,020 | $1,511 | Implemented |
TR0023 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,791 | $1,500 | Implemented |
TR0023 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,401 | $9,785 | Implemented |
LS1912 # 06 Y:2019 | 06 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,657 | $2,850 | Not Implemented |
LS1912 # 07 Y:2019 | 07 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $515 | $1,198 | Not Implemented |
LS1912 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,179 | $630 | Not Implemented |
LS1912 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,696 | $50 | Not Implemented |
LS1912 # 04 Y:2019 | 04 | 2019 | INSTALL AUTOMATIC PACKING EQUIPMENT | $1,164,856 | $900,000 | Not Implemented |
LS1912 # 02 Y:2019 | 02 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,767 | $150 | Not Implemented |
LS1912 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,700 | $46,200 | Not Implemented |
OR0716 # 06 Y:2019 | 06 | 2019 | OPTIMIZE PLANT POWER FACTOR | $9,287 | $19,796 | Not Implemented |
OR0716 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,967 | $10,000 | Implemented |
OR0716 # 07 Y:2019 | 07 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,641 | $23,504 | Not Implemented |
OR0716 # 01 Y:2019 | 01 | 2019 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $170,737 | $8,015 | Not Implemented |