IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

76

matching recommendations
Reset
SIC 3354 Aluminum Extruded Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0596 # 01 Y:2023 01 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,546,439 $3,990,000 Not Implemented
UF0596 # 03 Y:2023 03 2023 DIRECT WARMEST AIR TO COMBUSTION INTAKE $232,670 $300,000 Implemented
UF0596 # 02 Y:2023 02 2023 INSTALL SUB-METERING EQUIPMENT $266,539 $15,232 Implemented
UF0596 # 11 Y:2023 11 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,156 $2,352 Implemented
UF0596 # 10 Y:2023 10 2023 IMPROVE SPACE COMFORT CONDITIONING $26,447 $4,768 Implemented
UF0596 # 09 Y:2023 09 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,289 $25,440 Implemented
UF0596 # 04 Y:2023 04 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $213,087 $0 Implemented
UF0596 # 05 Y:2023 05 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $145,162 $141,225 Implemented
UF0596 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,499 $1,399 Implemented
UF0596 # 06 Y:2023 06 2023 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $50,904 $49,563 Implemented
UF0596 # 07 Y:2023 07 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $47,000 $171,903 Implemented
UF0448 # 10 Y:2011 10 2011 INSULATE BARE EQUIPMENT $5,708 $4,205 Not Implemented
UF0448 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $3,138 $1,469 Not Implemented
UF0448 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,949 $11,511 Not Implemented
UF0448 # 09 Y:2011 09 2011 USE COMPRESSOR AIR FILTERS $7,367 $1,634 Not Implemented
UF0448 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $3,518 $2,040 Implemented
UF0448 # 12 Y:2011 12 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $515,044 $294,885 Not Implemented
UF0448 # 05 Y:2011 05 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,034 $1,627 Not Implemented
UF0448 # 01 Y:2011 01 2011 INSTALL SKYLIGHTS $29,002 $67,157 Not Implemented
UF0448 # 03 Y:2011 03 2011 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $20,728 $4,066 Not Implemented
UF0448 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,395 $1,400 Not Implemented
UF0448 # 11 Y:2011 11 2011 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $291 $1,730 Not Implemented
UF0448 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,397 $9,355 Implemented
MI0139 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $3,192 $5,000 Implemented
MI0139 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,787 $40,200 Not Implemented