Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 3354 | Aluminum Extruded Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0250 # 09 Y:2000 | 09 | 2000 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $5,000 | $12,500 | Not Implemented |
SD0250 # 08 Y:2000 | 08 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $11,240 | $7,900 | Not Implemented |
SD0250 # 07 Y:2000 | 07 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $97,460 | $135,000 | Not Implemented |
SD0250 # 06 Y:2000 | 06 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $148,200 | $8,000 | Not Implemented |
SD0250 # 05 Y:2000 | 05 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $3,256 | $8,000 | Not Implemented |
SD0250 # 04 Y:2000 | 04 | 2000 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $8,901 | $40,000 | Not Implemented |
SD0250 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,942 | $4,100 | Not Implemented |
SD0250 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $44,752 | $600 | Implemented |
SD0250 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $45,106 | $210,000 | Not Implemented |
SD0250 # 10 Y:2000 | 10 | 2000 | SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED | $700 | $0 | Not Implemented |
CO0473 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,150 | $400 | Implemented |
CO0473 # 01 Y:2000 | 01 | 2000 | IMPROVE COMBUSTION CONTROL CAPABILITY | $74,960 | $1,050 | Implemented |
CO0473 # 10 Y:2000 | 10 | 2000 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $10,300 | $26,000 | Not Implemented |
CO0473 # 09 Y:2000 | 09 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $587,500 | $262,500 | Not Implemented |
CO0473 # 08 Y:2000 | 08 | 2000 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $39,460 | $10,000 | Implemented |
CO0473 # 07 Y:2000 | 07 | 2000 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $107,610 | $75,000 | Implemented |
CO0473 # 06 Y:2000 | 06 | 2000 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $1,260 | $500 | Implemented |
CO0473 # 05 Y:2000 | 05 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,180 | $6,780 | Implemented |
CO0473 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,980 | $1,000 | Implemented |
CO0473 # 03 Y:2000 | 03 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,360 | $10,000 | Implemented |
ND0361 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $606 | $750 | Not Implemented |
ND0361 # 04 Y:2000 | 04 | 2000 | INCREASE EFFICIENCY OF TRUCKS | $2,929 | $18,500 | Not Implemented |
ND0361 # 05 Y:2000 | 05 | 2000 | DEVELOP A REPAIR/REPLACE POLICY | $4,112 | $41,893 | Implemented |
ND0361 # 06 Y:2000 | 06 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,329 | $400 | Implemented |
ND0361 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,270 | $6,930 | Not Implemented |