IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
SIC 3355 Aluminum Rolling And Drawing, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0225 # 09 Y:2023 09 2023 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $18,229 $60,000 Not Implemented
DL0225 # 01 Y:2023 01 2023 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,327 $0 Implemented
DL0225 # 02 Y:2023 02 2023 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,327 $0 Implemented
DL0225 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,072 $500 Implemented
DL0225 # 04 Y:2023 04 2023 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $15,801 $4,102 Not Implemented
DL0225 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,896 $0 Not Implemented
DL0225 # 06 Y:2023 06 2023 INSULATE BARE EQUIPMENT $4,181 $6,480 Not Implemented
DL0225 # 07 Y:2023 07 2023 IMPROVE HANDLING PRACTICES $25,825 $10,000 Implemented
DL0225 # 08 Y:2023 08 2023 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,068 $28,750 Implemented
MU0033 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $872 $524 Not Implemented
MU0033 # 04 Y:2023 04 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,201 $0 Not Implemented
MU0033 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,285 $5,918 Not Implemented
MU0033 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $814 $270 Not Implemented
MU0033 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $1,490 $18 Not Implemented
UU0206 # 07 Y:2022 07 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,868 $1,019 Implemented
UU0206 # 04 Y:2022 04 2022 PAY UTILITY BILLS ON TIME $23,515 $750 Implemented
UU0206 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,802 $1,125 Not Implemented
UU0206 # 09 Y:2022 09 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $983 $375 Not Implemented
UU0206 # 02 Y:2022 02 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $79,430 $1,500 Implemented
UU0206 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $139,892 $110,800 Implemented
UU0206 # 03 Y:2022 03 2022 MODIFY STARTUP/SHUTDOWN TIMES $15,730 $3,713 Implemented
UU0206 # 06 Y:2022 06 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,388 $5,440 Not Implemented
UU0206 # 05 Y:2022 05 2022 MINIMIZE WATER USAGE $5,292 $1,764 Implemented
UK1901 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,440 $106,123 Implemented
UK1901 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,381 $750 Implemented