Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
101
matching recommendationsSIC | 3355 | Aluminum Rolling And Drawing, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1901 # 04 Y:2019 | 04 | 2019 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $22,646 | $20,000 | Not Implemented |
UK1901 # 08 Y:2019 | 08 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,566 | $188 | Not Implemented |
UK1901 # 09 Y:2019 | 09 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,440 | $106,123 | Implemented |
UK1901 # 05 Y:2019 | 05 | 2019 | INSTALL OCCUPANCY SENSORS | $507 | $245 | Implemented |
UK1901 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $283 | $520 | Implemented |
UK1901 # 07 Y:2019 | 07 | 2019 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $9,301 | $7,515 | Not Implemented |
UK1901 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,381 | $750 | Implemented |
UK1901 # 12 Y:2019 | 12 | 2019 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $467 | $360 | Not Implemented |
UK1901 # 10 Y:2019 | 10 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $265 | $550 | Not Implemented |
UK1901 # 11 Y:2019 | 11 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $754 | $280 | Implemented |
UK1901 # 13 Y:2019 | 13 | 2019 | COVER OPEN TANKS | $4,132 | $156 | Not Implemented |
UK1901 # 14 Y:2019 | 14 | 2019 | INSULATE BARE EQUIPMENT | $110 | $270 | Not Implemented |
UK1901 # 15 Y:2019 | 15 | 2019 | COVER OPEN TANKS | $6,024 | $5,000 | Not Implemented |
UK1901 # 16 Y:2019 | 16 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,281 | $1,000 | Implemented |
UK1811 # 01 Y:2018 | 01 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,721 | $2,250 | Not Implemented |
UK1811 # 08 Y:2018 | 08 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $282 | $164 | Implemented |
UK1811 # 07 Y:2018 | 07 | 2018 | INSTALL OCCUPANCY SENSORS | $2,332 | $4,270 | Implemented |
UK1811 # 06 Y:2018 | 06 | 2018 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $5,397 | $3,780 | Not Implemented |
UK1811 # 05 Y:2018 | 05 | 2018 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $2,503 | $0 | Implemented |
UK1811 # 04 Y:2018 | 04 | 2018 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $372 | $0 | Not Implemented |
UK1811 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,133 | $2,270 | Implemented |
UK1811 # 02 Y:2018 | 02 | 2018 | ELIMINATE/REDUCE AN OPERATION | $2,899 | $0 | Not Implemented |
WV0504 # 10 Y:2015 | 10 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $293 | $69 | Implemented |
WV0504 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,645 | $15,271 | Implemented |
WV0504 # 03 Y:2015 | 03 | 2015 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,770 | $5,240 | Not Implemented |