Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsSIC | 3355 | Aluminum Rolling And Drawing, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0044 # 02 Y:2009 | 02 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $31,002 | $5,550 | Not Implemented |
DL0044 # 03 Y:2009 | 03 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,300 | $575 | Not Implemented |
DL0044 # 04 Y:2009 | 04 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,400 | $950 | Not Implemented |
DL0044 # 05 Y:2009 | 05 | 2009 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $6,452 | $0 | Not Implemented |
DL0044 # 06 Y:2009 | 06 | 2009 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $37,189 | $70,000 | Not Implemented |
DL0044 # 01 Y:2009 | 01 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $89,460 | $41,150 | Not Implemented |
UA0032 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,663 | $0 | Implemented |
UA0032 # 07 Y:2009 | 07 | 2009 | USE MINIMUM SAFE OVEN VENTILATION | $3,687 | $4,300 | Implemented |
UA0032 # 06 Y:2009 | 06 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,240 | $2,900 | Implemented |
UA0032 # 05 Y:2009 | 05 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $4,594 | $680 | Not Implemented |
UA0032 # 04 Y:2009 | 04 | 2009 | DISCONNECT BALLASTS | $2,487 | $162 | Not Implemented |
UA0032 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $88,243 | $220,339 | Implemented |
UA0032 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,535 | $3,000 | Implemented |
WV0280 # 09 Y:2003 | 09 | 2003 | USE SYNTHETIC LUBRICANT | $4,705 | $250 | Implemented |
WV0280 # 12 Y:2003 | 12 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,953 | $7,230 | Implemented |
WV0280 # 11 Y:2003 | 11 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,080 | $477 | Implemented |
WV0280 # 08 Y:2003 | 08 | 2003 | BURN WASTE OIL FOR HEAT | $4,718 | $3,500 | Not Implemented |
WV0280 # 10 Y:2003 | 10 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,633 | $0 | Not Implemented |
WV0280 # 07 Y:2003 | 07 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,348 | $100 | Implemented |
WV0280 # 03 Y:2003 | 03 | 2003 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $63,438 | $8,180 | Not Implemented |
WV0280 # 02 Y:2003 | 02 | 2003 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $78,750 | $1,000 | Implemented |
WV0280 # 06 Y:2003 | 06 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,252 | $750 | Implemented |
WV0280 # 05 Y:2003 | 05 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $23,943 | $45,000 | Not Implemented |
WV0280 # 04 Y:2003 | 04 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $27,160 | $750 | Implemented |
WV0280 # 01 Y:2003 | 01 | 2003 | ADJUST BURNERS FOR EFFICIENT OPERATION | $143,927 | $209,000 | Not Implemented |