IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
SIC 3356 Nonferrous Rolling And Drawing, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0510 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $580 $1,450 Not Implemented
CO0510 # 06 Y:2002 06 2002 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,900 $250 Implemented
AR0160 # 06 Y:1999 06 1999 REDUCE SCRAP PRODUCTION $120,000 $80,000 Implemented
AR0160 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,689 $3,628 Implemented
AR0160 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $272 $1,750 Implemented
AR0160 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,374 $50 Implemented
AR0160 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,246 $450 Not Implemented
AR0160 # 05 Y:1999 05 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $9,048 $5,000 Implemented
AR0160 # 07 Y:1999 07 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $118,802 $300 Not Implemented
OR0257 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,254 $7,414 Implemented
OR0257 # 04 Y:1996 04 1996 OPTIMIZE PLANT POWER FACTOR $2,286 $4,800 Not Implemented
OR0257 # 03 Y:1996 03 1996 RECOVER AND REUSE COOLING WATER $3,097 $4,300 Implemented
OR0257 # 02 Y:1996 02 1996 COVER OPEN TANKS $4,287 $540 Not Implemented
OR0257 # 01 Y:1996 01 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $227 $0 Implemented
AS0122 # 09 Y:1994 09 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,874 $8,097 Not Implemented
AS0122 # 10 Y:1994 10 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $314 $220 Implemented
AS0122 # 08 Y:1994 08 1994 DISCONNECT BALLASTS $242 $200 Implemented
AS0122 # 07 Y:1994 07 1994 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,565 $5,200 Implemented
AS0122 # 06 Y:1994 06 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,540 $22,350 Not Implemented
AS0122 # 04 Y:1994 04 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $426 $1,260 Not Implemented
AS0122 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $370 $75 Not Implemented
AS0122 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,856 $4,686 Implemented
AS0122 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,094 $0 Implemented
AS0122 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,242 $400 Implemented
GT0411 # 06 Y:1990 06 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $170 $450 Implemented