Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
639
matching recommendationsSIC | 3357 | Nonferrous Wiredrawing & Insulating |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0643 # 03 Y:2024 | 03 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $11,390 | $0 | Not Implemented |
SD0643 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $55,833 | $125,021 | Not Implemented |
SD0643 # 08 Y:2024 | 08 | 2024 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $1,956 | $2,000 | Not Implemented |
SD0643 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM TEMPERATURE | $6,846 | $0 | Implemented |
SD0643 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $489 | $250 | Implemented |
SD0643 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $338 | $424 | Implemented |
SD0643 # 05 Y:2024 | 05 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,058 | $4,196 | Not Implemented |
SD0643 # 06 Y:2024 | 06 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $6,190 | $4,926 | Not Implemented |
UC2308 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,353 | $987 | Implemented |
UC2308 # 10 Y:2023 | 10 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $207,659 | $464,727 | Not Implemented |
UC2308 # 11 Y:2023 | 11 | 2023 | MODIFY STARTUP/SHUTDOWN TIMES | $11,360 | $7,140 | Not Implemented |
UC2308 # 04 Y:2023 | 04 | 2023 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $55,687 | $171,637 | Not Implemented |
UC2308 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,549 | $428 | Not Implemented |
UC2308 # 08 Y:2023 | 08 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,939 | $27,365 | Not Implemented |
UC2308 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,434 | $300 | Implemented |
UC2308 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,525 | $1,300 | Not Implemented |
UC2308 # 02 Y:2023 | 02 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $41,561 | $0 | Implemented |
UC2308 # 12 Y:2023 | 12 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $85,414 | $609,968 | Not Implemented |
UC2308 # 09 Y:2023 | 09 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $998 | $3,691 | Implemented |
UC2308 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $204,687 | $50,000 | Implemented |
UC2203 # 06 Y:2022 | 06 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,588 | $4,500 | Not Implemented |
UC2203 # 05 Y:2022 | 05 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,677 | $960 | Not Implemented |
UC2203 # 02 Y:2022 | 02 | 2022 | INSULATE BARE EQUIPMENT | $4,020 | $7,066 | Not Implemented |
UC2203 # 04 Y:2022 | 04 | 2022 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $22,048 | $108,454 | Not Implemented |
UC2203 # 03 Y:2022 | 03 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $35,091 | $2,940 | Not Implemented |