Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
639
matching recommendationsSIC | 3357 | Nonferrous Wiredrawing & Insulating |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0539 # 03 Y:2008 | 03 | 2008 | INSTALL OCCUPANCY SENSORS | $5,432 | $23,075 | Not Implemented |
OR0539 # 04 Y:2008 | 04 | 2008 | USE SOLAR HEAT TO MAKE ELECTRICTY | $106,649 | $758,330 | Not Implemented |
OR0539 # 05 Y:2008 | 05 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $15,317 | $72,600 | Not Implemented |
OR0539 # 06 Y:2008 | 06 | 2008 | OPTIMIZE PLANT POWER FACTOR | $4,450 | $19,950 | Not Implemented |
OR0539 # 07 Y:2008 | 07 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,860 | $0 | Not Implemented |
OR0539 # 08 Y:2008 | 08 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,510 | $0 | Not Implemented |
OR0539 # 09 Y:2008 | 09 | 2008 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $78,900 | $132,800 | Not Implemented |
OR0539 # 10 Y:2008 | 10 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $87,200 | $43,600 | Not Implemented |
OR0539 # 11 Y:2008 | 11 | 2008 | INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE | $52,540 | $2,200 | Not Implemented |
OR0539 # 12 Y:2008 | 12 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $46,700 | $46,700 | Not Implemented |
OR0539 # 13 Y:2008 | 13 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $7,300 | $5,700 | Not Implemented |
LE0271 # 01 Y:2008 | 01 | 2008 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $94,198 | $45,000 | Implemented |
LE0271 # 02 Y:2008 | 02 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $35,042 | $875 | Not Implemented |
LE0271 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,263 | $40,000 | Not Implemented |
LE0271 # 04 Y:2008 | 04 | 2008 | USE RADIANT HEATER FOR SPOT HEATING | $17,604 | $3,900 | Not Implemented |
LE0271 # 05 Y:2008 | 05 | 2008 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $14,909 | $30,000 | Not Implemented |
LE0271 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,337 | $3,000 | Implemented |
LE0271 # 07 Y:2008 | 07 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,931 | $1,000 | Not Implemented |
LE0271 # 08 Y:2008 | 08 | 2008 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $5,095 | $7,278 | Not Implemented |
LE0271 # 09 Y:2008 | 09 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,934 | $1,000 | Implemented |
LE0271 # 10 Y:2008 | 10 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,865 | $150 | Not Implemented |
LE0271 # 11 Y:2008 | 11 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $804 | $500 | Not Implemented |
LE0271 # 12 Y:2008 | 12 | 2008 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $704 | $255 | Not Implemented |
LE0271 # 13 Y:2008 | 13 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,736 | $54,562 | Not Implemented |
MA0630 # 01 Y:2008 | 01 | 2008 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $29,594 | $49,500 | Not Implemented |