Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
SIC 3357 Nonferrous Wiredrawing & Insulating
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0643 # 08 Y:2024 08 2024 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $1,956 $2,000 n/a
SD0643 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $489 $250 n/a
SD0643 # 06 Y:2024 06 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $6,190 $4,926 n/a
SD0643 # 05 Y:2024 05 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,058 $4,196 n/a
SD0643 # 04 Y:2024 04 2024 USE OPTIMUM TEMPERATURE $6,846 $0 n/a
SD0643 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $338 $424 n/a
SD0643 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $55,833 $125,021 n/a
SD0643 # 03 Y:2024 03 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $11,390 $0 n/a
SF0586 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,887 $0 Implemented
SF0586 # 03 Y:2022 03 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $38,078 $22,361 Implemented
SF0586 # 05 Y:2022 05 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $35,916 $68,135 Implemented
SF0586 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,868 $0 Implemented
SF0586 # 08 Y:2022 08 2022 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $62,090 $317,631 Implemented
SF0586 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $1,974 $4,260 Implemented
SF0586 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,736 $14,830 Implemented
SF0586 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,428 $26,487 Implemented
SF0200 # 05 Y:2000 05 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $16,728 $70,000 Not Implemented
SF0200 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,619 $2,800 Not Implemented
SF0200 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,122 $13,280 Not Implemented
SF0200 # 04 Y:2000 04 2000 RECOVER AND REUSE WASTE MATERIAL $24,800 $0 Not Implemented
SF0200 # 02 Y:2000 02 2000 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,726 $7,750 Not Implemented
SF0141 # 10 Y:1998 10 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,077 $9,025 Not Implemented
SF0141 # 09 Y:1998 09 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,307 $0 Not Implemented
SF0141 # 03 Y:1998 03 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $408 $358 Not Implemented
SF0141 # 04 Y:1998 04 1998 OPTIMIZE PLANT POWER FACTOR $1,692 $1,797 Not Implemented