IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
SIC 3357 Nonferrous Wiredrawing & Insulating
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2308 # 12 Y:2023 12 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $85,414 $609,968 Not Implemented
UC2308 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $204,687 $50,000 Implemented
UC2308 # 02 Y:2023 02 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $41,561 $0 Implemented
UC2308 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,353 $987 Implemented
UC2308 # 04 Y:2023 04 2023 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $55,687 $171,637 Not Implemented
UC2308 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,549 $428 Not Implemented
UC2308 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,434 $300 Implemented
UC2308 # 08 Y:2023 08 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,939 $27,365 Not Implemented
UC2308 # 09 Y:2023 09 2023 INSTALL TIMERS AND/OR THERMOSTATS $998 $3,691 Implemented
UC2308 # 10 Y:2023 10 2023 ADOPT IN-HOUSE MATERIAL GENERATION $207,659 $464,727 Not Implemented
UC2308 # 11 Y:2023 11 2023 MODIFY STARTUP/SHUTDOWN TIMES $11,360 $7,140 Not Implemented
UC2308 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,525 $1,300 Not Implemented
UC2203 # 05 Y:2022 05 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,677 $960 Not Implemented
UC2203 # 01 Y:2022 01 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $13,662 $9,582 Not Implemented
UC2203 # 02 Y:2022 02 2022 INSULATE BARE EQUIPMENT $4,020 $7,066 Not Implemented
UC2203 # 03 Y:2022 03 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $35,091 $2,940 Not Implemented
UC2203 # 04 Y:2022 04 2022 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $22,048 $108,454 Not Implemented
UC2203 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,588 $4,500 Not Implemented
UC2203 # 07 Y:2022 07 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $806,860 $4,875,813 Not Implemented
MA0720 # 04 Y:2013 04 2013 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,238 $10,000 Implemented
MA0720 # 08 Y:2013 08 2013 REDUCE VENTILATION AIR $2,479 $6,235 Not Implemented
MA0720 # 07 Y:2013 07 2013 REDUCE VENTILATION AIR $4,116 $2,500 Implemented
MA0720 # 06 Y:2013 06 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $5,682 $500 Not Implemented
MA0720 # 05 Y:2013 05 2013 REDUCE VENTILATION AIR $7,186 $2,510 Not Implemented
MA0720 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $10,121 $12,390 Implemented