IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,079

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0096 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $31,331 $6 Implemented
IP0096 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,206 $905 Implemented
IP0096 # 08 Y:2018 08 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,917 $12,782 Implemented
IP0096 # 09 Y:2018 09 2018 USE OPTIMUM THICKNESS INSULATION $18,548 $984 Implemented
IP0096 # 10 Y:2018 10 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,834 $68,658 Implemented
IP0096 # 11 Y:2018 11 2018 ADD AREA LIGHTING SWITCHES $1,738 $130 Implemented
WM0110 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $38,561 $90,000 Implemented
WM0110 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,832 $23,000 Implemented
UF0508 # 01 Y:2017 01 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $26,071 $44,637 Implemented
UF0508 # 02 Y:2017 02 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,114 $20,000 Implemented
UF0508 # 03 Y:2017 03 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,931 $12,400 Implemented
UF0508 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,193 $2,737 Implemented
UF0508 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,144 $1,169 Implemented
UF0508 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,564 $0 Implemented
UF0508 # 07 Y:2017 07 2017 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $3,384 $640 Implemented
UF0508 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $1,548 $478 Implemented
UF0508 # 09 Y:2017 09 2017 ELIMINATE LEAKS IN WATER LINES AND VALVES $3,871 $700 Implemented
TT0191 # 01 Y:2017 01 2017 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $33,156 $94,000 Implemented
TT0191 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $3,453 $8,274 Implemented
TT0191 # 05 Y:2017 05 2017 INSTALL TIMERS AND/OR THERMOSTATS $1,175 $250 Implemented
IP0079 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,047 $6 Implemented
IP0079 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,340 $147 Implemented
IP0079 # 05 Y:2017 05 2017 COVER OPEN TANKS $20,504 $766 Implemented
IP0079 # 08 Y:2017 08 2017 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $742 $90 Implemented
IP0079 # 09 Y:2017 09 2017 APPLY FOR INVESTMENT INCENTIVES $38,196 $5,000 Implemented