IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,079

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0163 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $499 $60 Implemented
KU0163 # 06 Y:1985 06 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $979 $0 Implemented
KU0163 # 09 Y:1985 09 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $462 $140 Implemented
KU0163 # 11 Y:1985 11 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $130 $180 Implemented
KU0163 # 12 Y:1985 12 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $357 $455 Implemented
KU0163 # 13 Y:1985 13 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $324 $175 Implemented
KU0163 # 16 Y:1985 16 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,273 $1,000 Implemented
KU0163 # 17 Y:1985 17 1985 INSTALL AUTOMATIC STACK DAMPER $363 $900 Implemented
KU0163 # 18 Y:1985 18 1985 SHUT OFF PILOTS IN STANDBY EQUIPMENT $160 $0 Implemented
MA0023 # 01 Y:1985 01 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,752 $4,628 Implemented
MA0023 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $225 $100 Implemented
MA0023 # 03 Y:1985 03 1985 REVISE SMOKE CLEANUP FROM OPERATIONS $6,061 $1,447 Implemented
MA0023 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $450 $66 Implemented
LT0001 # 01 Y:1984 01 1984 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $6,220 $12,200 Implemented
LT0001 # 03 Y:1984 03 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,340 $0 Implemented
LT0001 # 05 Y:1984 05 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $66,754 $0 Implemented
TN0207 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,155 $12,500 Implemented
TN0207 # 02 Y:1984 02 1984 INSULATE BARE EQUIPMENT $18,357 $750 Implemented
TN0207 # 03 Y:1984 03 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,215 $21,000 Implemented
TN0207 # 04 Y:1984 04 1984 INSTALL SET-BACK TIMERS $645 $0 Implemented
UD0070 # 02 Y:1982 02 1982 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $6,051 $10,000 Implemented
UD0070 # 03 Y:1982 03 1982 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $13,079 $15,000 Implemented
GT0126 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,537 $140 Implemented
KU0050 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,836 $4,009 Implemented
KU0050 # 02 Y:1982 02 1982 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $118,344 $10,000 Implemented