IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

279

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0157 # 07 Y:2000 07 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $4,141 $3,250 Not Implemented
BD0138 # 01 Y:1999 01 1999 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $32,466 $119,000 Not Implemented
BD0138 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $31,953 $91,000 Implemented
BD0138 # 03 Y:1999 03 1999 COVER OPEN TANKS $2,467 $5,000 Not Implemented
BD0138 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,839 $4,270 Implemented
BD0138 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,227 $393 Not Implemented
BD0138 # 06 Y:1999 06 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $918 $0 Implemented
BD0138 # 07 Y:1999 07 1999 INSTALL OCCUPANCY SENSORS $824 $1,425 Not Implemented
BD0138 # 08 Y:1999 08 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $630 $800 Implemented
BD0138 # 09 Y:1999 09 1999 USE AN ALTERNATIVE DESULFURIZING AGENT TO ELIMINATE HAZARDOUS SLAG FORMATION $173,301 $3,000 Not Implemented
BD0138 # 10 Y:1999 10 1999 MINIMIZE WATER USAGE $766 $1,665 Implemented
BD0138 # 11 Y:1999 11 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $139,776 $246,000 Implemented
WI0357 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,443 $155,500 Not Implemented
WI0357 # 02 Y:1999 02 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $39,582 $76,000 Not Implemented
WI0357 # 03 Y:1999 03 1999 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $25,236 $60,000 Not Implemented
WI0357 # 04 Y:1999 04 1999 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $24,655 $10,800 Implemented
WI0357 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,282 $1,580 Not Implemented
WI0357 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $900 $210 Implemented
WI0357 # 07 Y:1999 07 1999 DISTILL CONTAMINATED SOLVENTS FOR REUSE $2,963 $7,000 Not Implemented
WI0357 # 08 Y:1999 08 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,702 $1,000 Not Implemented
WI0357 # 09 Y:1999 09 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,780 $0 Not Implemented
WI0357 # 10 Y:1999 10 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,131 $4,017 Implemented
WI0357 # 11 Y:1999 11 1999 INSULATE BARE EQUIPMENT $494 $848 Not Implemented
BD0049 # 01 Y:1996 01 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $30,711 $1,500 Implemented
BD0049 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,901 $1,050 Not Implemented