IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,412

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0291 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,222 $685 Implemented
IA0291 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,929 $920 Implemented
IA0291 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,120 $50 Not Implemented
IA0291 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,174 $682 Not Implemented
IA0291 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,242 $25,134 Implemented
IA0291 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,844 $476 Implemented
IA0291 # 07 Y:2002 07 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,689 $7,199 Implemented
IA0291 # 08 Y:2002 08 2002 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $7,328 $25,016 Implemented
IA0291 # 09 Y:2002 09 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $23,689 $59,400 Not Implemented
IA0291 # 10 Y:2002 10 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $55,348 $77,600 Implemented
UM0215 # 01 Y:2002 01 2002 RECYCLE CASTING SAND $12,300 $50,000 Not Implemented
UM0215 # 02 Y:2002 02 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $1,824 $1,000 Not Implemented
UM0215 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $980 $225 Not Implemented
UM0215 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $730 $1,000 Not Implemented
UM0215 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $366 $31 Not Implemented
WI0415 # 01 Y:2002 01 2002 USE EVAPORATION TO CONCENTRATE MATERIAL $13,072 $12,500 Not Implemented
WI0415 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $3,596 $1,000 Implemented
WI0415 # 03 Y:2002 03 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,296 $0 Not Implemented
WI0415 # 04 Y:2002 04 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,616 $0 Not Implemented
WI0415 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,252 $1,086 Implemented
WI0415 # 06 Y:2002 06 2002 REPLACE CLOTH RAGS WITH PAPER TOWELS $737 $0 Not Implemented
WI0415 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $307 $68 Implemented
LM0028 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $10,685 $980 Implemented
LM0028 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $4,363 $2,200 Not Implemented
LM0028 # 03 Y:2002 03 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $49,880 $53,000 Not Implemented