Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,412
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0357 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $42,443 | $155,500 | Not Implemented |
WI0357 # 02 Y:1999 | 02 | 1999 | USE EVAPORATION TO CONCENTRATE MATERIAL | $39,582 | $76,000 | Not Implemented |
WI0357 # 03 Y:1999 | 03 | 1999 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $25,236 | $60,000 | Not Implemented |
WI0357 # 04 Y:1999 | 04 | 1999 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $24,655 | $10,800 | Implemented |
WI0357 # 05 Y:1999 | 05 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,282 | $1,580 | Not Implemented |
WI0357 # 06 Y:1999 | 06 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $900 | $210 | Implemented |
WI0357 # 07 Y:1999 | 07 | 1999 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $2,963 | $7,000 | Not Implemented |
WI0357 # 08 Y:1999 | 08 | 1999 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,702 | $1,000 | Not Implemented |
WI0357 # 09 Y:1999 | 09 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,780 | $0 | Not Implemented |
WI0357 # 10 Y:1999 | 10 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,131 | $4,017 | Implemented |
WI0357 # 11 Y:1999 | 11 | 1999 | INSULATE BARE EQUIPMENT | $494 | $848 | Not Implemented |
OR0352 # 01 Y:1999 | 01 | 1999 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $60,160 | $81,250 | Not Implemented |
OR0352 # 02 Y:1999 | 02 | 1999 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,270 | $3,200 | Not Implemented |
OR0352 # 03 Y:1999 | 03 | 1999 | OPTIMIZE PLANT POWER FACTOR | $9,819 | $8,400 | Not Implemented |
OR0352 # 04 Y:1999 | 04 | 1999 | USE OPTIMUM THICKNESS INSULATION | $3,970 | $950 | Not Implemented |
OR0352 # 05 Y:1999 | 05 | 1999 | COVER OPEN TANKS | $1,940 | $870 | Not Implemented |
OR0352 # 06 Y:1999 | 06 | 1999 | COVER OPEN TANKS | $2,130 | $5,385 | Not Implemented |
OR0352 # 07 Y:1999 | 07 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,430 | $0 | Not Implemented |
UM0142 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $416 | $450 | Implemented |
UM0142 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,691 | $1,250 | Implemented |
UM0142 # 03 Y:1999 | 03 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $39 | $0 | Implemented |
UM0142 # 04 Y:1999 | 04 | 1999 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $55,979 | $38,958 | Not Implemented |
UM0142 # 05 Y:1999 | 05 | 1999 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $44,187 | $52,200 | Not Implemented |
UM0142 # 06 Y:1999 | 06 | 1999 | OPTIMIZE PLANT POWER FACTOR | $7,489 | $10,860 | Implemented |
UM0142 # 07 Y:1999 | 07 | 1999 | METER WASTE WATER | $6,412 | $500 | Implemented |