IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,412

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0142 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $150,000 $150,000 Not Implemented
UD0573 # 01 Y:1999 01 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $238,622 $0 Implemented
UD0573 # 02 Y:1999 02 1999 RECYCLE CASTING SAND $159,120 $310,000 Implemented
UD0573 # 03 Y:1999 03 1999 PREHEAT COMBUSTION AIR WITH WASTE HEAT $30,590 $30,500 Not Implemented
UD0573 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $10,431 $6,000 Not Implemented
UD0573 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,523 $14,669 Implemented
UD0573 # 06 Y:1999 06 1999 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $1,294 $200 Not Implemented
DS0141 # 01 Y:1999 01 1999 PREHEAT COMBUSTION AIR WITH WASTE HEAT $10,285 $24,040 Implemented
DS0141 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $4,260 $4,500 Implemented
DS0141 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,031 $700 Implemented
DS0141 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,348 $900 Implemented
DS0141 # 05 Y:1999 05 1999 UPGRADE OBSOLETE EQUIPMENT $13,679 $32,000 Implemented
DS0141 # 06 Y:1999 06 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,184 $1,200 Implemented
DS0141 # 07 Y:1999 07 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $77,215 $0 Not Implemented
DS0141 # 08 Y:1999 08 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $6,612 $400 Not Implemented
DS0141 # 09 Y:1999 09 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $3,240 $1,000 Not Implemented
DS0141 # 10 Y:1999 10 1999 INCREASE USE OF AUTOMATION $416,318 $440,000 Not Implemented
UM0137 # 01 Y:1999 01 1999 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $420 $0 Implemented
UM0137 # 02 Y:1999 02 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,358 $40,000 Implemented
UM0137 # 03 Y:1999 03 1999 IMPROVE SPACE COMFORT CONDITIONING $4,047 $16,100 Implemented
UM0137 # 04 Y:1999 04 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $164,382 $400,000 Not Implemented
WI0343 # 01 Y:1999 01 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $22,608 $500 Not Implemented
WI0343 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,616 $94,400 Not Implemented
WI0343 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,468 $60 Implemented
WI0343 # 04 Y:1999 04 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,053 $9,000 Not Implemented