IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,412

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0184 # 05 Y:1993 05 1993 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,440 $2,800 Implemented
WI0184 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,030 $640 Not Implemented
WI0184 # 07 Y:1993 07 1993 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $637 $225 Not Implemented
WI0184 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $162 $0 Not Implemented
WV0008 # 01 Y:1993 01 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,872 $1,600 Not Implemented
WV0008 # 02 Y:1993 02 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $966 $582 Implemented
WV0008 # 03 Y:1993 03 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,773 $598 Implemented
WV0008 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $419 $576 Implemented
WV0008 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $100 $7,275 Implemented
WV0008 # 06 Y:1993 06 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $285 $0 Not Implemented
WV0008 # 07 Y:1993 07 1993 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $12,781 $408 Implemented
WV0008 # 08 Y:1993 08 1993 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $2,138 $2,057 Not Implemented
WV0008 # 09 Y:1993 09 1993 RECOVER WASTE HEAT FROM EQUIPMENT $1,407 $682 Not Implemented
SF0004 # 01 Y:1993 01 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $29,275 $20,000 Implemented
SF0004 # 02 Y:1993 02 1993 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $48,223 $135,000 Not Implemented
SF0004 # 03 Y:1993 03 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,565 $38,000 Implemented
SF0004 # 04 Y:1993 04 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,292 $20,600 Not Implemented
SF0004 # 05 Y:1993 05 1993 INSULATE FEEDWATER TANK $1,488 $3,000 Implemented
SF0004 # 06 Y:1993 06 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,881 $6,250 Implemented
SF0004 # 07 Y:1993 07 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,386 $1,800 Implemented
SF0004 # 08 Y:1993 08 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,308 $700 Implemented
SF0004 # 09 Y:1993 09 1993 MOVE BOILER TO MORE EFFICIENT LOCATION $414 $639 Implemented
SF0004 # 10 Y:1993 10 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $298 $158 Not Implemented
AS0086 # 01 Y:1993 01 1993 INSULATE BARE EQUIPMENT $1,799 $992 Not Implemented
AS0086 # 02 Y:1993 02 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,024 $2,200 Not Implemented