Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
46
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0457 # 01 Y:2018 | 01 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,174 | $0 | Implemented |
AS0457 # 02 Y:2018 | 02 | 2018 | USE SOLAR HEAT FOR HEAT | $7,441 | $1,961 | Not Implemented |
AS0457 # 03 Y:2018 | 03 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,791 | $19,647 | Not Implemented |
AS0457 # 04 Y:2018 | 04 | 2018 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $4,539 | $2,530 | Not Implemented |
AS0457 # 05 Y:2018 | 05 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,412 | $2,750 | Not Implemented |
AS0457 # 06 Y:2018 | 06 | 2018 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,736 | $7,600 | Not Implemented |
AS0457 # 07 Y:2018 | 07 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,832 | $676 | Implemented |
AS0345 # 04 Y:2003 | 04 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,428 | $8,500 | Implemented |
AS0345 # 08 Y:2003 | 08 | 2003 | INSTALL EQUIPMENT TO MOVE PRODUCT | $16,133 | $825 | Not Implemented |
AS0345 # 05 Y:2003 | 05 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $216 | $89 | Implemented |
AS0345 # 09 Y:2003 | 09 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $15,623 | $5,760 | Not Implemented |
AS0345 # 11 Y:2003 | 11 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $910 | $960 | Not Implemented |
AS0345 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $519 | $3,755 | Implemented |
AS0345 # 10 Y:2003 | 10 | 2003 | CLEAR AND RENT EXISTING SPACE | $11,984 | $9,060 | Not Implemented |
AS0345 # 06 Y:2003 | 06 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $209 | $49 | Implemented |
AS0345 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $294 | $30 | Not Implemented |
AS0345 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,950 | $30 | Implemented |
AS0345 # 07 Y:2003 | 07 | 2003 | USE SYNTHETIC LUBRICANT | $420 | $3,231 | Not Implemented |
AS0297 # 02 Y:2001 | 02 | 2001 | INSTALL SKYLIGHTS | $1,527 | $3,086 | Not Implemented |
AS0297 # 06 Y:2001 | 06 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $5,712 | $5,916 | Not Implemented |
AS0297 # 05 Y:2001 | 05 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $3,360 | $60 | Not Implemented |
AS0297 # 04 Y:2001 | 04 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $25,657 | $90,000 | n/a |
AS0297 # 03 Y:2001 | 03 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $520 | $240 | Not Implemented |
AS0297 # 01 Y:2001 | 01 | 2001 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $166,920 | $35,000 | n/a |
AS0086 # 10 Y:1993 | 10 | 1993 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $7,086 | $50,250 | Not Implemented |