IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0457 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,174 $0 Implemented
AS0457 # 02 Y:2018 02 2018 USE SOLAR HEAT FOR HEAT $7,441 $1,961 Not Implemented
AS0457 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,791 $19,647 Not Implemented
AS0457 # 04 Y:2018 04 2018 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $4,539 $2,530 Not Implemented
AS0457 # 05 Y:2018 05 2018 RECOVER WASTE HEAT FROM EQUIPMENT $2,412 $2,750 Not Implemented
AS0457 # 06 Y:2018 06 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,736 $7,600 Not Implemented
AS0457 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,832 $676 Implemented
AS0345 # 04 Y:2003 04 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,428 $8,500 Implemented
AS0345 # 08 Y:2003 08 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $16,133 $825 Not Implemented
AS0345 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $216 $89 Implemented
AS0345 # 09 Y:2003 09 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $15,623 $5,760 Not Implemented
AS0345 # 11 Y:2003 11 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $910 $960 Not Implemented
AS0345 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $519 $3,755 Implemented
AS0345 # 10 Y:2003 10 2003 CLEAR AND RENT EXISTING SPACE $11,984 $9,060 Not Implemented
AS0345 # 06 Y:2003 06 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $209 $49 Implemented
AS0345 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $294 $30 Not Implemented
AS0345 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,950 $30 Implemented
AS0345 # 07 Y:2003 07 2003 USE SYNTHETIC LUBRICANT $420 $3,231 Not Implemented
AS0297 # 02 Y:2001 02 2001 INSTALL SKYLIGHTS $1,527 $3,086 Not Implemented
AS0297 # 06 Y:2001 06 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $5,712 $5,916 Not Implemented
AS0297 # 05 Y:2001 05 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,360 $60 Not Implemented
AS0297 # 04 Y:2001 04 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,657 $90,000 n/a
AS0297 # 03 Y:2001 03 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $520 $240 Not Implemented
AS0297 # 01 Y:2001 01 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $166,920 $35,000 n/a
AS0086 # 10 Y:1993 10 1993 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,086 $50,250 Not Implemented