IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0096 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,979 $2,680 Implemented
UD0979 # 11 Y:2018 11 2018 ADD AREA LIGHTING SWITCHES $1,666 $130 Implemented
UD0979 # 10 Y:2018 10 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,834 $68,160 Implemented
UD0979 # 09 Y:2018 09 2018 USE OPTIMUM THICKNESS INSULATION $18,548 $984 Implemented
UD0979 # 08 Y:2018 08 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,917 $12,782 Implemented
UD0979 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,206 $905 Implemented
UD0979 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $31,331 $6 Implemented
UD0979 # 01 Y:2018 01 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,640 $0 Implemented
IP0096 # 11 Y:2018 11 2018 ADD AREA LIGHTING SWITCHES $1,738 $130 Implemented
IP0096 # 10 Y:2018 10 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,834 $68,658 Implemented
UD0979 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,299 $1,000 Implemented
IP0096 # 08 Y:2018 08 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,917 $12,782 Implemented
IP0096 # 09 Y:2018 09 2018 USE OPTIMUM THICKNESS INSULATION $18,548 $984 Implemented
IP0096 # 01 Y:2018 01 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,640 $0 Implemented
IP0096 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $31,331 $6 Implemented
IP0096 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,206 $905 Implemented
IP0079 # 09 Y:2017 09 2017 APPLY FOR INVESTMENT INCENTIVES $38,196 $5,000 Implemented
IP0079 # 08 Y:2017 08 2017 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $742 $90 Implemented
IP0079 # 05 Y:2017 05 2017 COVER OPEN TANKS $20,504 $766 Implemented
IP0079 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,340 $147 Implemented
IP0079 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,047 $6 Implemented
IP0079 # 12 Y:2017 12 2017 OPTIMIZE PLANT POWER FACTOR $23,934 $35,575 Implemented
IP0079 # 13 Y:2017 13 2017 APPLY FOR INVESTMENT INCENTIVES $2,977 $5,000 Implemented
IP0031 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,588 $22,450 Implemented
IP0031 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,679 $59,914 Implemented